My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-12_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2017-12-12_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2021 2:26:55 PM
Creation date
12/12/2017 2:00:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
12/12/2017
Doc Name
Monthly Report
From
Battle Mountain Resources
To
DRMS
Annual Report Year
2017
Report Quarter_Month
Nov
Email Name
LJW
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br /> BATTLE MOUNTAIN RESOURCES, INC. <br /> December 7,2017 <br /> DEC 12 Z017 <br /> Mr.Lucas J. West <br /> State of Colorado DMSIO111 <br /> Division of Reclamation,Mining and Safety MWGANG <br /> 1313 Sherman Street,Room 215 <br /> Denver,CO 80203 <br /> Re: Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Perini o.M-88-112 <br /> November 201 eport <br /> Dear Mr. Lucas: <br /> The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMR1), <br /> San Luis Project for the month of November 2107. <br /> Surface and ground water monitoring and analysis were completed for all required sites during the month <br /> per the terms and conditions of the TR-32 Quality Assurance and Quality Control(QA/QC)plan. <br /> Vacuum on the tailing lysimeters was verified on November 30t', no water was present for sampling and <br /> subsequent analysis. <br /> Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br /> Pit monitoring wells on November 3&. The November tailing impoundment piezometer measurements <br /> identified these installations were either dry or contained less than 12 inches of water as illustrated in <br /> Table 2. Tables 1 and 2 below identify the depth to water measurements collected for each of the site <br /> monitoring wells, piezometers and lysimeters as required by the terms and conditions of the TR-32 <br /> QA/QC plan. <br /> The leak detection system was measured on November 30t'. A total of 890 gallons of water was <br /> excavated from the leak detection system yielding a monthly average of 29.6 gpad. The tailings pond <br /> under-drain measured 37.5 gpm. <br /> During the month of November,the West Pit water treatment plant operated efficiently discharging a total <br /> of 7,567,400 gallons(23.23 acre-feet)of water to Rito Seco Creek and a total of 723,800 gallons(2.22 <br /> acre-feet)of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito <br /> Seco Creek remained dry during the month. <br /> P.O.Box 310 • San Luis,Colorado 81152-0310 • (719)379-0798 • Fax(719)379-0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.