Laserfiche WebLink
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> Poverty Gulch QA <br /> NewFields Job No.475.0106.021 <br /> Wednesday October 04,2017 <br /> FIELD DAILY PROGRESS REPORT <br /> PROJECT: POVERTY GULCH DIVERSION CHANNEL <br /> SITE: CRIPPLE CREEK&VICTOR GOLD MINE (COLORADO) <br /> CONTRACTOR: CONLEY CONSTRUCTION <br /> DATE: WEDNESDAY, OCTOBER 04, 2017 <br /> TEMPERATURE: LOW: 39°F TO HIGH: 531 <br /> WEATHER: SUNNY AND BREEZY <br /> NEWFIELDS PERSONNEL ONSITE: ROXANNE LI, FIELD TECHNICIAN <br /> 1.0 EARTHWORKS <br /> The Deere 350D excavator was used to place soil over the exposed goetextile at the edges of <br /> the channel. <br /> 2.0 GEOTEXTILE <br /> No geotextile was placed today. <br /> 3.0 RIPRAP <br /> Conley construction continued to place riprap up to station 3+40. <br /> 4.0 CONCRETE AND GROUT <br /> No concrete or grout was poured today. Langston Concrete will be on site tomorrow afternoon <br /> to remove the formwork. <br /> 5.0 NEWFIELDS AND/OR CONTRACTOR FIELD/LABORATORY TESTING <br /> RMG was on site briefly to collect the concrete cylinders and to collect a sample of backfill <br /> material to perform for a modified proctor test. <br /> 6.0 MEETINGS AND COMMUNICATIONS <br /> No meetings were attended today. <br /> 7.0 ISSUES, CONCERNS, MISCELLANEOUS ACTIVITIES <br /> No issues or concerns today. <br /> Page 1 <br />