My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2017-12-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2021 10:35:05 AM
Creation date
12/11/2017 4:49:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
12/11/2017
Doc Name Note
Acceptance of Certification Report
Doc Name
Construction Quality Assurance Report (CQA)
From
Newmont
To
DRMS
Type & Sequence
TR86
Email Name
TC1
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation ■ <br /> Cripple Creek&Victor Gold Mine . <br /> Poverty Gulch QA <br /> NewFields Job No.475.0106.021 <br /> Thursday October 05,2017 <br /> FIELD DAILY PROGRESS REPORT <br /> PROJECT: POVERTY GULCH DIVERSION CHANNEL <br /> SITE: CRIPPLE CREEK &VICTOR GOLD MINE (COLORADO) <br /> CONTRACTOR: CONLEY CONSTRUCTION <br /> DATE: THURSDAY, OCTOBER 05, 2017 <br /> TEMPERATURE: LOW: 39'F TO HIGH: 59°F <br /> WEATHER: CLEAR SKIES <br /> NEWFIELDS PERSONNEL ONSITE: ROXANNE LI, FIELD TECHNICIAN <br /> 1.0 EARTHWORKS <br /> The existing ground on the east side of the diversion channel was graded away from the channel <br /> in order to keep out runoff associated with the nearby Pit. <br /> 2.0 GEOTEXTILE <br /> Geotextile was unrolled and placed lengthwise along the channel using the Deere 350D LC <br /> excavator up to station 4+80. Three rolls were used—one along the bottom, and one along each <br /> of the channel sides. Overlap was approximately six feet along the edges of the panels. Once <br /> placed, the panels were held in place with riprap placed along the top edges. <br /> 3.0 RIPRAP <br /> Conley construction continued to place riprap up to station 4+45. Riprap was also placed at the <br /> outlet of the channel up to existing grade. <br /> 4.0 CONCRETE AND GROUT <br /> Langston Concrete was on site at approximately 12:30 P.M. to remove the formwork for the <br /> concrete headwall. The area around the headwall will be backfilled early next week. <br /> 5.0 NEWFIELDS AND/OR CONTRACTOR FIELD/LABORATORY TESTING <br /> No testing was conducted today. <br /> 6.0 MEETINGS AND COMMUNICATIONS <br /> No meetings were attended today. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.