My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-11_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2017-12-11_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2021 10:35:05 AM
Creation date
12/11/2017 4:49:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
12/11/2017
Doc Name Note
Acceptance of Certification Report
Doc Name
Construction Quality Assurance Report (CQA)
From
Newmont
To
DRMS
Type & Sequence
TR86
Email Name
TC1
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont Mining Corporation <br /> Cripple Creek&Victor Gold Mine ■ <br /> Poverty Gulch QA <br /> NewFields Job No.475.0106.021 <br /> Wednesday October 11,2017 <br /> FIELD DAILY PROGRESS REPORT <br /> PROJECT: POVERTY GULCH DIVERSION CHANNEL <br /> SITE: CRIPPLE CREEK &VICTOR GOLD MINE (COLORADO) <br /> CONTRACTOR: CONLEY CONSTRUCTION <br /> DATE: WEDNESDAY, OCTOBER 11, 2017 <br /> TEMPERATURE: LOW: 38°F TO HIGH: 60°F <br /> WEATHER: CLEAR SKIES <br /> NEWFIELDS PERSONNEL ONSITE: ROXANNE LI,JOE HICKEY, CHAD SCHREINER, FIELD <br /> TECHNICIANS <br /> 1.0 EARTHWORKS <br /> Conley Construction completed the excavation of the diversion channel using the Deere 350D <br /> excavator. <br /> On the west side of the diversion channel, at approximately station 4+80, there is a small natural <br /> drainage area that discharges directly into the project channel. The topsoil (approximately 6"- <br /> 12") of this natural drainage area was stripped and compacted with a minimum of four passes of <br /> the Bomag mini compactor. <br /> 2.0 GEOTEXTILE <br /> Geotextile was placed over the compacted subgrade of the natural drainage area that discharges <br /> into the project channel. <br /> 3.0 RIPRAP <br /> Approximately 1.5 feet of Dso= 18" riprap was placed over the geotextile in the natural drainage <br /> area. <br /> 4.0 CONCRETE AND GROUT <br /> Langston Concrete arrive on site at 10:00 A.M. to set up the Concord All Terrain pump truck on a <br /> ledge above the upstream end of the diversion channel. Two truckloads of grout were delivered <br /> to the project site by Transit Mix Concrete; one at 12:30 P.M. and one at 4:30 P.M. Grout was <br /> placed around the riprap at the entrance of the channel by Langston Concrete. The finished <br /> grouted riprap was covered with tarps for the night. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.