Laserfiche WebLink
Newmont Mining Corporation ' <br /> Cripple Creek&Victor Gold Mine ■ <br /> Poverty Gulch QA <br /> NewFields Job No.475.0106.021 <br /> Thursday October 12,2017 <br /> FIELD DAILY PROGRESS REPORT <br /> PROJECT: POVERTY GULCH DIVERSION CHANNEL <br /> SITE: CRIPPLE CREEK &VICTOR GOLD MINE (COLORADO) <br /> CONTRACTOR: CONLEY CONSTRUCTION <br /> DATE: THURSDAY, OCTOBER 12, 2017 <br /> TEMPERATURE: LOW: 37*F TO HIGH: 55°F <br /> WEATHER: CLEAR SKIES, WITH WINDS PICKING UP IN THE AFTERNOON <br /> NEWFIELDS PERSONNEL ONSITE: ROXANNE LI, FIELD TECHNICIAN <br /> 1.0 EARTHWORKS <br /> The remainder of the channel (station 4+80 to station 6+81) was surveyed by Foresight West <br /> Surveying. Conley Construction compacted the bottom and sides of this portion of channel with <br /> a minimum of four passes of the Bomag mini compactor. The channel sides were compacted for <br /> a minimum vertical distance of 5 feet from the channel base. The subgrade of this section of <br /> channel was approved for geotextile placement. <br /> 2.0 GEOTEXTILE <br /> No geotextile was placed today due to the wind. <br /> 3.0 RIPRAP <br /> No riprap was placed today. <br /> 4.0 CONCRETE AND GROUT <br /> No concrete or grout was poured today. <br /> 5.0 NEWFIELDS AND/OR CONTRACTOR FIELD/LABORATORY TESTING <br /> Rocky Mountain Group (RMG) was on site in the afternoon to collect the grout cylinders for <br /> testing. <br /> 6.0 MEETINGS AND COMMUNICATIONS <br /> No meetings were attended today. <br /> Page 1 <br />