Laserfiche WebLink
e <br /> REPORT OF FLY ASH ANALYSIS <br /> Project Name: Craig <br /> Sample ID#: 170201004 Tested By: QC <br /> Sample Date: January 2017 Report Date: 30-Mar•17 <br /> CHEMICAL TESTS RESULTS ASTM C 618 AASHTO M 295 <br /> CLASS FIC CLASS FIC <br /> Silicon Dioxide(SIO2),% 53.14 <br /> Aluminum Oxide(A1203),% 23.50 <br /> Iron Oxide(Fe203),% 5.56 <br /> Sum of S102,A1203,Fe203,% 82.20 70.0I50.0 min. 70.0150.0 min. <br /> Calcium Oxide(CaO),% 8.29 <br /> Magnesium Oxide(M ),% 2.13 <br /> Sulfur Trioxide(S03), % 0.42 5.0 max, 5.0 max. <br /> Sodium Oxide(Na2O),% 2.59 <br /> Potassium Oxide(K20),% 1.02 <br /> Available Alkalies(as.Na2O),% 0.93 <br /> PHYSICAL TESTS RESULTS ASTM C 618 AASHTO M 295 <br /> CLASS FIC CLASS FIC <br /> Moisture Content,% 0.00 3.0 max. 3.0 max <br /> Loss on Ignition,% 0.36 6.0 max. 5.0 max. <br /> Amount Retained on No,325 Sieve,% 17,76 34 max. 34 max. <br /> Specific Gravity 2.26 <br /> Auloclave Soundness,% 0.02 0.6 max. 0.8 max <br /> Strength Activity Index with Portland Cement <br /> at 7 days,%of Control 84.3 75 min.' 75 min.' <br /> Strength Activity Index with Portland Cement <br /> at 28 days,%of Control 96.8 75 min.' 75 min." <br /> Water Required,%of Control 96.7 105 max. 105 max <br /> Loose Bulk Density,Ibs/ft 73.7 <br /> Meets ASTM C 618 and AASHTO M 295,Class F <br /> 'Meeting the 7 day or 28 day strength activity index will ind.cate specification compliance. <br /> SIT(/J10a t u'a <br /> Melissa Garcia <br /> Quality Assurance I Laboratory Manager <br />