Laserfiche WebLink
The land owner will receive compensation for the extraction on a $2/cubic yard basis for the <br />temporary use of the soil. <br />14. Please supply a copy of any documents that will ensure that the area of extraction will be <br />reclaimed to some beneficial land use once extraction activities have been completed. <br />See attached contract. <br />15. Do you have permits for this activity from any other governmental agencies such as building, <br />construction, or grading permits, and if so, what are they? <br />SWPP — Colorado Department of Public Health and Environment (See attached permits) <br />16. Are there state/federal/local agency participants in terms of funding (yes) -(no), design (yes) -(no). <br />What are the percentages? <br />Yes, this is a Colorado Department of Transportation project is and is funded and designed by <br />CDOT. <br />17. What post mining uses will be made of the site of extraction and why? <br />(This 6 helps us determine the intent of the activity) <br />After extraction of soils, JHL will temporarily establish erosion control measures until soils are <br />placed back into site. At which point JHL will permanently seed and establish area back to original <br />conditions. <br />18. What types and sizes of equipment will be used in the extraction? <br />JOHN DEERE 9520 TRACTOR <br />KTEC 1228 SCRAPER <br />