Laserfiche WebLink
2.05.4 - RECLAMATION PLAN <br /> RECLAMATION TIMETABLE <br /> After completion of mining the following sequence of reclamation events <br /> will occur. These actions are estimated to take the specified amount of <br /> time but GCC Energy, LLC does not commit to any specified timeframe. <br /> Certain activities may be accelerated or delayed dependent on season <br /> and whether they can be carried on contemporaneously with other <br /> activities. <br /> ACTIVITY ESTIMATED <br /> TIMEFRAME <br /> Mine Portal Sealing One month <br /> Demolition and Removal of Structures Four months <br /> Backfilling and Grading Six months <br /> Re-Establishment of Surface Drainages Two months <br /> Re-Topsoiling Two months <br /> Reve etation One Month <br /> Removal of Sediment Control Structures, Re- Two months <br /> Topsoiling, and Reve etation two years later <br /> Reve etation Monitoring Biennially <br /> RECLAMATION COSTS <br /> The most recent cost estimate are be contained in Appendix 12. <br /> REMOVAL OF SURFACE FACILITIES <br /> All mine surface facilities, shown on the Operations Plan and Surface <br /> Features Map (King II-007), will be disassembled or removed from the <br /> mine site. The foundations, steel, and other non-woody material that <br /> cannot be sold for salvage will be pushed against the high-wall and <br /> covered by at least four (4) feet of non-toxic non-combustible fill and <br /> topsoil. Woody material will be removed from the mine site or burned. <br /> All necessary county and state approvals will be obtained prior to <br /> burying any demolition debris on the site. <br /> The following surface facilities and structures will be disassembled, <br /> removed, or otherwise reclaimed as described below. The designations <br /> following the surface facility name correspond to the legend on Map King <br /> II-007. <br /> GCC Energy, LLC King II Mine <br /> Section 2.05.4 <br /> Page 1 July 11, 2017 (RN-07) <br />