2.05.2 - OPERATION PLAN - ESTIMATED AREA FOR LIFE OF MINE <br />OPERATIONS <br />PRODUCTION METHODS AND EQUIPMENT <br />The King II Mine is an underground coal mining operation employing room and pillar <br />design and techniques for extraction of the coal resource from the upper Menefee <br />seam. <br />The engineering and design of the mine require that coal reserves be divided into <br />sections or panels convenient for extraction and in alignment with the mains to <br />facilitate access and extraction. Rooms (larger open areas from which coal is <br />extracted) are developed. Coal pillars are left at the periphery of the rooms to support <br />the main roof. The size, location, and number of rooms and pillars are determined by <br />the physical characteristics (thickness, load bearing capability, presence of non -coal <br />inclusions) of the coal in a given location of the mine. With the completion of a given <br />panel or section (when all minable coal has been extracted), the remaining pillars are <br />mined as the operation retreats from the panel. In this way, the recovery of the coal <br />is maximized. Site work began at the King II mine April, 2007. The first coal was <br />extracted July 25, 2007. Proven coal reserves at present are approximately 5 million <br />tons. Annual production during 2016 was 628,952.60 tons. Total shipping from the <br />mine is governed by La Plata County Special Land Use Permit PL2012-0089 and <br />associated Road Improvement Agreement (RIW) (see Appendix 2(1). The annual <br />projected maximum production of coal as per said permit is approximately 1,070,000 <br />tons (depending on average loaded tons per truck) upon completion of Phase 5 or the <br />RIW, based on approximately 28.5 average loaded tons per truck, 120 trucks per day, <br />6 days per week. Various other agency permits limit production to 1.3 million tons. <br />Total life of mine at maximum projected production is estimated to be 5 years <br />(August, 2022). <br />The coal is mined using one or two continuous mining units (sections). These <br />sections consist of one or two continuous miners, 2-4 shuttle cars, one or two dual <br />boom roof drills (bolter machines), a feeder/breaker belt feeder, and a 12,470- <br />950/480 volt power center. After coal is cut from the face by the continuous miner, <br />it is loaded into the shuttle cars for transporting to the conveyor belt and removal <br />from the mine. <br />OPERATION DESCRIPTION <br />The King II Mine, being an underground operation, affected the majority of surface <br />lands during the construction of surface facilities. The lands affected by the <br />construction of mine surface facilities and mine access is specifically described in <br />Sections 2.04.3 (Site Description and Land Use), 2.04.9 (Soils), 2.04. 10 (Vegetation) <br />and 2.04.11 (Fish and Wildlife Resources) of this document. <br />All areas of potential and actual surface disturbance for the King II Mine have been <br />incorporated into the permit document. GCC Energy does not anticipate obtaining a <br />new, separate five-year permit for any areas other than those depicted or described in <br />the King II permit at this time, nor are changes in operations or facilities anticipated <br />at this time. <br />GCC Energy, LLC King II Mine <br />Section 2.05.2 <br />Page 1 July 11, 2017 (RN -07) <br />