My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-29_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2017-11-29_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 8:05:40 AM
Creation date
12/8/2017 7:58:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
11/29/2017
Doc Name Note
Findings RN7 Enclosed Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining, Inc.
Permit Index Doc Type
Findings
Email Name
RAR
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 61 of 270 <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />153.00 <br />LCY <br />Heaped Volume: <br />192.00 <br />LCY <br />Average Volume: <br />172.50 <br />LCY <br />Adjusted Volume: <br />169.72 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: 120.75 <br />Loading Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 58.900 LCY (heaped) <br />Bucket Fill Factor: 1.025 Rock - Earth Mixture 100%-105% 1.025 <br />Adjusted Capacity: 60.373 LCY <br />Job Condition Corrections: Site Altitude (ft.): 7150 feet <br />Truck Loader Source <br />Altitude Adj: 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.790 0.790 (CAT HB) <br />Net Correction: 0.790 0.790 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill 2 <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, NA <br />maneuver): <br />LCY <br />passes <br />minutes <br />Cycle Time Factors <br />Net Cycle Time Adjustment: NA <br />Factor (min.) <br />Source <br />Material: <br />NA <br />NA <br />(Cat HB) <br />Stockpile: <br />NA <br />NA <br />(Cat HB) <br />Truck Ownership: <br />NA <br />NA <br />(Cat HB) <br />Operation: <br />NA <br />NA <br />(Cat HB) <br />Dump Target: <br />NA <br />NA <br />(Cat HB) <br />CIRCES Cost Estimating Software <br />Net Cycle Time Adjustment: NA <br />minutes <br />Adjusted Loader Cycle Time: 0.563 <br />minutes <br />Net Load Time per Truck: 1.126 <br />minutes <br />Truck Cycle Time: <br />Truck Exchange Time: 0.80 <br />Minutes Adjusted for site altitude: <br />0.800 Minutes <br />Truck Load Time: 1.126 <br />Minutes Adjusted for site altitude: <br />1.126 Minutes <br />Truck Maneuver and Dump 1.20 <br />Minutes Adjusted for site altitude: <br />1.200 Minutes <br />Time: <br />Truck Travel (Haul & Return) Time: <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.