My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-29_GENERAL DOCUMENTS - C1981010
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981010
>
2017-11-29_GENERAL DOCUMENTS - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2017 8:05:40 AM
Creation date
12/8/2017 7:58:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
11/29/2017
Doc Name Note
Findings RN7 Enclosed Cost Estimate
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Trapper Mining, Inc.
Permit Index Doc Type
Findings
Email Name
RAR
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pagc 57 of 270 <br />TRUCK/LOADER TEAM WORK <br />Task description: K/Gd Pits Regrade (Truck/Trackhoe); Cross Section 40550ON <br />Site: Trapper Mine Permit Action: RN07 Permit/Job#: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: DO1 State: Colorado <br />Date: 7/10/2017 County: Moffat <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: KOMATSU 830E <br />-Loader: CAT 6090 <br />Support Equipment -Load Area: Cat DI IT - I IU <br />-Dump Area: Cat DI IT - I IU <br />Road Maintenance -Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 14,000 Gal. <br />Abbreviation: None <br />Filename: C010-DO1 <br />Shift basis: 3 ner day <br />Cost Breakdown: Truck/Loader Team Sunnort Eauimnent Maintenance Eauipment <br />Truck Shovel <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: 100 100 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost/hour: $186.73 $23.07 <br />$226.13 <br />$226.13 <br />$72.40 <br />$74.07 <br />Operating cost/hour: $186.98 $930.15 <br />$183.90 <br />$183.90 <br />$28.99 <br />$54.40 <br />%Utilization -riper: NA 0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: NA $0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: NA $0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: $32.15 $37.79 <br />$41.85 <br />$41.85 <br />$28.90 <br />$0.00 <br />Unit Subtotals: $405.86 $991.01 <br />$451.88 <br />$451.88 <br />$130.28 <br />$128.47 <br />Number of Units: 4 1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: Work: $2,614.45 <br />Support: $903.76 <br />Maint: $258.75 <br />Total work team cost/hour: $3,776.96 <br />MATERIAL OUANTITIES <br />Initial volume: 375,847 CCY Swell factor: 1.000 <br />Loose volume: 375,847 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: <br />2,900 <br />Pounds/LCY <br />Description: <br />Decomposed rock - <br />50% Rock, 50% Earth <br />Rated Payload: <br />492,200 <br />Pounds <br />Payload Capacity: <br />169.72 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.