Laserfiche WebLink
Pagc 57 of 270 <br />TRUCK/LOADER TEAM WORK <br />Task description: K/Gd Pits Regrade (Truck/Trackhoe); Cross Section 40550ON <br />Site: Trapper Mine Permit Action: RN07 Permit/Job#: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: DO1 State: Colorado <br />Date: 7/10/2017 County: Moffat <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: KOMATSU 830E <br />-Loader: CAT 6090 <br />Support Equipment -Load Area: Cat DI IT - I IU <br />-Dump Area: Cat DI IT - I IU <br />Road Maintenance -Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 14,000 Gal. <br />Abbreviation: None <br />Filename: C010-DO1 <br />Shift basis: 3 ner day <br />Cost Breakdown: Truck/Loader Team Sunnort Eauimnent Maintenance Eauipment <br />Truck Shovel <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: 100 100 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost/hour: $186.73 $23.07 <br />$226.13 <br />$226.13 <br />$72.40 <br />$74.07 <br />Operating cost/hour: $186.98 $930.15 <br />$183.90 <br />$183.90 <br />$28.99 <br />$54.40 <br />%Utilization -riper: NA 0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: NA $0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: NA $0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: $32.15 $37.79 <br />$41.85 <br />$41.85 <br />$28.90 <br />$0.00 <br />Unit Subtotals: $405.86 $991.01 <br />$451.88 <br />$451.88 <br />$130.28 <br />$128.47 <br />Number of Units: 4 1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: Work: $2,614.45 <br />Support: $903.76 <br />Maint: $258.75 <br />Total work team cost/hour: $3,776.96 <br />MATERIAL OUANTITIES <br />Initial volume: 375,847 CCY Swell factor: 1.000 <br />Loose volume: 375,847 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: <br />2,900 <br />Pounds/LCY <br />Description: <br />Decomposed rock - <br />50% Rock, 50% Earth <br />Rated Payload: <br />492,200 <br />Pounds <br />Payload Capacity: <br />169.72 <br />LCY <br />CIRCES Cost Estimating Software <br />