Laserfiche WebLink
Job Condition Correction Factor <br />Operator Skill: <br />0.750 <br />Material consistency: <br />1.000 <br />Dozing method: <br />1.200 <br />Visibility: <br />0.800 <br />Job efficiency: <br />0.790 <br />Spoil pile: <br />1.000 <br />Push gradient: <br />1.601 <br />Altitude: <br />1.000 <br />Material Weight: <br />0.929 <br />Blade type: <br />1.000 <br />Net correction: 0.8460 <br />Adjusted unit 641.01 LCY/hr <br />production: <br />Adjusted fleet 2564.04 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.705/LCY <br />Total job time: 11.24 Hours <br />Total job cost: $20,336 <br />Source <br />(AVG.) <br />(CAT HB) <br />(S -BY -S) <br />(POOR) <br />(3 SHIFTS/DAY) <br />(DOZ-OC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />Page 2 of 270 <br />CIRCES Cost Estimating Software <br />