Laserfiche WebLink
Table 3. Summary of Applicable SL -12 Bond Release Amounts — Section 16 Pit <br />Task <br />Cost <br />Haul Topsoil from Stockpile 16D to Section 16 Pit <br />$443,001.00 <br />Reseed Section 16 Pit with Gazing Land Seed Mix <br />$94,193.00 <br />Weed Control -10% of Reseeded Areas Four Times <br />$12,635.00 <br />Subtotal of directcosts (roundedto nearestdollar) <br />$549,829.00 <br />Indirect Costs (rounded to nearestdollar) <br />$113,435.00 <br />Total Amount Releasable <br />$663,264.00 <br />Table 4 —Topsoil Verification Hole Depths <br />Hole <br />Number <br />Reclamation <br />Parcel <br />Depth <br />(inches) <br />1 <br />16013 <br />21 <br />2 <br />16016 <br />20 <br />3 <br />16016 <br />21 <br />4 <br />16012 <br />20 <br />5 <br />16015 <br />25 <br />6 <br />16016 <br />23 <br />7 <br />16016 <br />21 <br />8 <br />16016 <br />20 <br />9 <br />16011 <br />24 <br />10 <br />16009 <br />19 <br />11 <br />16016 <br />19 <br />12 <br />16011 <br />24 <br />13 <br />16016 <br />26 <br />14 <br />16009 <br />18 <br />15 <br />16005 <br />21 <br />16 <br />16002 <br />18 <br />17 <br />16002 <br />19 <br />Proposed Decision and Findings of Compliance December 2017 <br />Partial Phase II and III Bond Release SL -12 Page 13 <br />