Laserfiche WebLink
WEST DRYING AREA <br />YJAND COMPACTION AREA ,/B.2 ACl <br />EAST DRYING AREA <br />RESERVED POR EAST LINDERDRAIN <br />COMPACTION N.T.S <br />2' (Min) <br />I I <br />Vari betvfeen 2' to 6' COMMON FILL <br />A SROCK DRAIN <br />FILTER FABRIC <br />IRAFI 140 OR <br />N TUBAL GRI D <br />EQUAL <br />L' 3' <br />Y,' SCREENED OR <br />PERFORATED <br />WASHED ROCK <br />PIPE TYPICAL SECTION <br />GOB PILE NO. 3 <br />ROCK SUBDRAINAGE SYSTEM <br />TYPICAL SECTION <br />GOB PILE FOOT PRINT <br />SHOWS ORIENTATION OF STACKED GOB <br />sem.. <br />CHPIL <br />/ <br />EAST GOB DRYIN . sTOPc /L <br />AREA - c. C7 FiFl <br />POND 'J' / r <br />~ DIST!/RBED AREA BOUNDARY <br />WEST 608 DG <br />AREA_- / / SECTION A -A <br />WINTER GOB STACKING PLAN <br />t NO PILE OVERLAP <br />SPACE BETWEEN ROWS TO BE GRADED <br />TO ACHIEVE POSITIVE DRAINAGE. MAINTAIN <br />FLOW PATH AS NECESSARY. <br />N PROJECT. BOWIE RESOURCES, LLC <br />W E TITLE: GOB PILE #3 DRYING/PLACEMENT LOCATION <br />,SONEINCH OPERATIONAL SEDIMENTATION CONTROL PLAN <br />DESIGNED BY: J.E.S. 02/27/14 DMG I.D. No. C - 1996 - 083 DWG. NAME: <br />REVISED BY: T.K.B. 08/18/17 SCALE: <br />NOT TO SCALE <br />TR -114 -VOLUME XI. 4b- 10/17 <br />