My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-12-05_GENERAL DOCUMENTS - C2010089
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C2010089
>
2017-12-05_GENERAL DOCUMENTS - C2010089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2017 1:33:52 PM
Creation date
12/5/2017 9:25:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
General Documents
Doc Date
12/5/2017
Doc Name Note
RN1
Doc Name
Permit Document
From
Elk Ridge Mining and Reclamation, LLC
To
DRMS
Permit Index Doc Type
Permit Legal Document
Email Name
BFB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. The permittee shall comply with the terms and conditions of this permit, all <br />applicable performance standards of the Act, and the requirements of these Rules. <br />10. Continuous, uninterrupted bond coverage shall be in effect at all times, and an <br />adequate bond amount shall be maintained pursuant to the requirements of Rule <br />3.02.2. Operating without a bond is a violation of a condition upon which this <br />permit is issued. <br />11. If analyses of the mining and reclamation operation and the data collected through <br />monitoring and experimentation by the operator or monitoring by the Division <br />indicate in the judgment of the Division that the operation will not be able to <br />comply with the requirements of the Act and lawful rules and regulations <br />thereunder, operator hereby agrees to exercise its best efforts, after consulting with <br />the Division, to modify the plans prospectively to correct such deficiencies. Such <br />modifications may require technical revisions or amendments to the permit. <br />12. This permit may be revoked or suspended for non-compliance with the Act or <br />lawful rules or regulations promulgated by the Board. <br />13. No coal mining operations shall be conducted on Federal surface or coal until the <br />Secretary of the Interior has approved the mining plan. The Division reserves the <br />right to modify the permit, when appropriate, in order to resolve conflicts between <br />the permit requirements and the requirements of other laws, rules and regulations <br />administered by the Secretary of the Interior. <br />14. a. Operator hereby bargains, sells and conveys unto the State of Colorado the <br />right to enter upon the lands above described and to accomplish thereon the <br />reclamation of such lands as required by this permit and by applicable law. <br />b. Such right to enter shall be exercisable only if the Board or the Division shall <br />have lawfully determined: <br />i. that reclamation required by law to have been performed upon such <br />lands has not been performed, and that <br />ii. the bond or surety forfeiture proceedings described in the Act or <br />similar provisions of subsequent laws, if any, have been initiated. <br />C. Such right to enter shall be exercisable only within the period of time <br />expiring twenty-one (2 1) years after the death of all the individuals whose <br />names appear on this permit on the date of its issuance. Such right shall <br />automatically expire when reclamation has been completed and sureties <br />released. <br />
The URL can be used to link to this page
Your browser does not support the video tag.