6225
<br />6200 7
<br />j iy;1 �r
<br />T+ 6 75 i
<br />r
<br />i 6150
<br />6125
<br />B6075
<br />f
<br />. „ 6050
<br />1
<br />t6O2iA
<br />R
<br />G
<br />6200 1'
<br />I a
<br />at.
<br />6175 i
<br />r
<br />Ir• 6150 ��
<br />h•� >r
<br />01.
<br />9
<br />�^ '! ti •4is + +t -Air 6100Li�, d ,-r •�-:!1}K. IM } v .► r,.*,y
<br />]T j
<br />1 • iii � � •s
<br />'f:,REVEGETATED AREA J'� , h, _ . ,i✓ „ _
<br />•
<br />_ ..� sops
<br />/. ._ (±1.51 ACRES)
<br />REVEGETATION 1 i , ' 1 �� . •pip,
<br />BOUNDARY �� -- -- — S.' ` J
<br />► t� MINE BOUNDARY r' ' �� �<`
<br />(±8.0 ACRES) �� soso
<br />��� ����� Ail,+' � ,/'' e — � — — — — —_ •' . ' •' + ` ' ��? R � �.'� , �,'t "-
<br />-RECLAIMED MINE AREAti, i
<br />0Af
<br />.�- � � • , , . �i, '�' r �.. � f girt
<br />4r. -f
<br />< :. / + r ROCK FALL
<br />PROTECTION BERM : 'e..
<br />.fib' 1 • f , !, � � \ ' '+s 1J •y ' r • i ••. / .�
<br />VIL
<br />l 1 ftp 1 . 1 - -, _. / •
<br />r
<br />1� �,, , ~ � / ,. i •/ � j+/� WOAD
<br />CHEVRON U.S.A., INC.
<br />CLEAR CREEK BORROW MINE
<br />SEC. 36, T5S, & SEC. 4, T6S, R98W, 6TH P.M.
<br />E -FILE: E:\Chevron\Bouow PIdDWG\BORROW PIT.dwg
<br />SCALE: 1" = 100'
<br />DRAWN BY: B.W.W.
<br />DATE DRAWN: 7 JUNE 2016
<br />UELS FILE NO.: C- 5 2 0 4
<br />PROD. NO: CHE02-16-0012
<br />RECLAMATION MAP NOTES
<br />1. REVEGETATED AREA HAS BEEN RECLAIMED USING
<br />POCKETING METHODS TO ESTABLISH SHRUB
<br />GROWTH.
<br />2. AS MINING OPERATIONS CONTINUE, PARTS OF THE
<br />` ACTIVE MINE AREA WILL BE RECLAIMED USING
<br />POCKETING METHODS TO ESTABLISH SHRUB
<br />GROWTH.
<br />3. THERE ARE NO PONDS AT THIS SITE.
<br />4. THERE IS NO OVERBURDEN TO BE REPLACED.
<br />5. 3 INCHES TO 6 INCHES OF TOPSOIL WILL BE
<br />REPLACED IN ALL RECLAIMED/REVEGETATED
<br />AREAS.
<br />JON
<br />VINTAH
<br />ENGINEERING t LAND SURVEYING
<br />MINE BOUNDARY DESCRIPTION
<br />1. THE MINING BOUNDARY IS DESCRIBED AS BEING
<br />LOCATED IN TRACT 108 OF SECTION 4, T6S, R98W,
<br />STH P.M. AND THE SE 1/4 SW 1/4 AND SW 1/4 SE 1/4
<br />OF SECTION 36, T5S, R98W, 6TH P.M.
<br />RECLAMATION
<br />— — 0000 — — EXISTING MAJOR CONTOURS
<br />(25' INTERVAL)
<br />0000 EXISTING MAJOR CONTOURS
<br />(25' INTERVAL)
<br />— — MINE BOUNDARY
<br />— — — — — REVEGETATION BOUNDARY
<br />EXISTING EDGE OF ROAD
<br />— ------ 4- DRAINAGE - FLOW DIRECTION
<br />i".PpO L/C�
<br />JUNE 9, 22016�f(Q�
<br />CIVIL ENGINEERING AND
<br />LAND SURVEYING SERVICES
<br />85 South 200 East, Vernal, UT 84078
<br />O: 435.789.1017
<br />www.uintahgroup.com
<br />— SINCE 1964 —
<br />_
<br />,.,� •Y�Y;"+►•• t.
<br />�i, ,
<br />_r.-� S. EXISTING 18" CMP
<br />• � ;
<br />� STORMWATER
<br />i K
<br />�z
<br />MINE MAIN ENTRANCE
<br />LAT: 3933- 47.13" N
<br />y
<br />LONG: 108° 20'20.07"W
<br />(NAD 83)
<br />CHEVRON U.S.A., INC.
<br />CLEAR CREEK BORROW MINE
<br />SEC. 36, T5S, & SEC. 4, T6S, R98W, 6TH P.M.
<br />E -FILE: E:\Chevron\Bouow PIdDWG\BORROW PIT.dwg
<br />SCALE: 1" = 100'
<br />DRAWN BY: B.W.W.
<br />DATE DRAWN: 7 JUNE 2016
<br />UELS FILE NO.: C- 5 2 0 4
<br />PROD. NO: CHE02-16-0012
<br />RECLAMATION MAP NOTES
<br />1. REVEGETATED AREA HAS BEEN RECLAIMED USING
<br />POCKETING METHODS TO ESTABLISH SHRUB
<br />GROWTH.
<br />2. AS MINING OPERATIONS CONTINUE, PARTS OF THE
<br />` ACTIVE MINE AREA WILL BE RECLAIMED USING
<br />POCKETING METHODS TO ESTABLISH SHRUB
<br />GROWTH.
<br />3. THERE ARE NO PONDS AT THIS SITE.
<br />4. THERE IS NO OVERBURDEN TO BE REPLACED.
<br />5. 3 INCHES TO 6 INCHES OF TOPSOIL WILL BE
<br />REPLACED IN ALL RECLAIMED/REVEGETATED
<br />AREAS.
<br />JON
<br />VINTAH
<br />ENGINEERING t LAND SURVEYING
<br />MINE BOUNDARY DESCRIPTION
<br />1. THE MINING BOUNDARY IS DESCRIBED AS BEING
<br />LOCATED IN TRACT 108 OF SECTION 4, T6S, R98W,
<br />STH P.M. AND THE SE 1/4 SW 1/4 AND SW 1/4 SE 1/4
<br />OF SECTION 36, T5S, R98W, 6TH P.M.
<br />RECLAMATION
<br />— — 0000 — — EXISTING MAJOR CONTOURS
<br />(25' INTERVAL)
<br />0000 EXISTING MAJOR CONTOURS
<br />(25' INTERVAL)
<br />— — MINE BOUNDARY
<br />— — — — — REVEGETATION BOUNDARY
<br />EXISTING EDGE OF ROAD
<br />— ------ 4- DRAINAGE - FLOW DIRECTION
<br />i".PpO L/C�
<br />JUNE 9, 22016�f(Q�
<br />CIVIL ENGINEERING AND
<br />LAND SURVEYING SERVICES
<br />85 South 200 East, Vernal, UT 84078
<br />O: 435.789.1017
<br />www.uintahgroup.com
<br />— SINCE 1964 —
<br />
|