Laserfiche WebLink
V <br /> OPERATIONS <br /> ® Climax Molybdenum COL° d°so P Mine <br /> &Mill <br /> 68 <br /> A Freeport-McMoRan Company Empire, CO 80438 <br /> Phone(303)569-3221 <br /> Fax(303) 569-2830 <br /> November 29, 2017 REeEIVE® <br /> UPS Tracking#: 1 Z 804 847 03 7480 2503 <br /> DEC 01 .2011 <br /> Mr. Peter Hays DIVISION OF RECLAMATION <br /> State of Colorado MINING AND SAFETY <br /> Division of Reclamation, Mining & Safety <br /> 1313 Sherman Street, Rm 215 <br /> Denver, CO 80203 <br /> Re: Climax Molybdenum C Hen erson Operations; File No. M-1977-342 <br /> Technical Revision No. F!(TR!--27); 3 am Regrade Adequacy Review Response <br /> Mr. Hays, <br /> Climax Molybdenum Company received your letter dated November 21, 2017, regarding your <br /> adequacy review completed on the final submittal for completion of TR-27. In your letter, you <br /> requested the following items be submitted to the Division: <br /> 1. Revised construction certification page with correct technical revision number reference. <br /> 2. Copy of the construction certification statement containing the required professional <br /> engineer stamp, signature and date for TR-27 <br /> 3. Copy of the as-built drawing containing the required engineer stamp, signature and date <br /> for TR-27. <br /> The aforementioned documents have been updated and are included with this letter. If you have <br /> any other questions or need any additional information, please do not hesitate to contact me at <br /> thaynespfmi.com or(720) 942-3518. <br /> Regards, <br /> Tim Haynes <br /> Chief Environmental Scientist <br /> Climax Molybdenum Company <br /> Henderson Operations <br /> Enc. <br /> CC: M.Hamarat,CMC <br />