Laserfiche WebLink
McAtee Construction Company Harley Pit #1 <br /> Permit# M-1986-147 2017 Annual Report <br /> Notes: <br /> Please refer to the 2017 Annual Report Map for location of the areas of disturbance in the mine. <br /> We continued to remove material from stockpiles and the mined area. No reclamation is required <br /> at this time. The markings and colors noted in the text reference areas shown on the map. <br /> (8) Approximately 0.67 acres was stripped this year(cross hatched). <br /> (9) The reclaimed areas (green)continue to be monitor and are growing as expected. <br /> (10)Mining will continue on the mine face and we mined in the stripped area this year (yellow). We <br /> may strip an addition area, if needed,south of the current mining face. There is 16.35 acres of <br /> stockpile area in use(orange). <br /> (11)No reclamation is required next year, but we will resoil and seed any area that become ready <br /> for reclamation. <br /> (13) Weed control was done in June 2017 this year in accordance with the Weed Management Plan <br /> on the perimeter of the mine and spot work was done on the mine floor areas and roadways. Escort <br /> and 2-4-D was applied as needed. Weed control will continue in 2018. <br /> (18) The current bond is $117,150 and was last increased in January 2017 after an normal <br /> inspection indicated more was needed. <br />