Laserfiche WebLink
1' 60'TEMPORARY I $ <br /> i RCONSTRUCTION I <br /> + .• I EXISTING IMPROVED <br /> 1 4y EASEMENT FARM ACCESS ROAD E <br /> Rec No. 325837 I NORTH TO WELD s01 <br /> " 6�.JvuAi:i I 50'PIPELINE RIGHT-OF-WAY COUNTY ROAD 74) <br /> I 11 �j EASEMENT(BK 1641,PG 296) F)I - 4-0 <br /> r 1 <br /> 50'SETBACK `- <br /> I1 FROM EASEMENT XISTING GAS LIN 300 0 300 Feet c <br /> SINCLAIR PIPELIN a 02 <br /> + <br /> 20'MINING ! I j \ y� .. I OMPANY w <br /> •• (IN FEET) O L <br /> y SETBACK `\ 1 inch=300 ft. /�' U <br /> HARM I R II - ���i ;� Y��. � � Q 25 <br /> SITE PERMIT AREA i ,I < <br /> .�nr)' i z z <br /> II ! ` `y`�� 2-TRACK i VENTURES LLC NOTES: 0 " <br /> .9 ACRES SHADED i' i' ( \ P 200' DIRTIACCESS �� '�®-- O <br /> a, • I 1. The proposed permit boundar encamp-..,,, <br /> approximately approximately 9.9 acres with�ly about o <br /> y,_I 20'MINING _ ��,. I I Q <br /> E`S�CK 6.5 acres currently planned for mining. U <br /> STOCKPILE ATER LINES 2. Material processing is not expected to take J <br /> \� place on site, however a portable processing <br /> TYPICAL r' r= l I•I CITY OF GREELEY a_facility for product screening may be brought Q <br /> ` I to the site and used as needed. The facilities <br /> 200' _ ' I XI TING GAS LINE n <br /> ` ,`��� SINCLAIR PIPELIN will be located within the pit close to where < <br /> OMPANY active mining is occurring. w Z <br /> "=200' , `�'� - I 3. Groundwater is not expected to be W •- Q <br /> . • �� I EXISTING PERMIT encountered during mining. -0 d <br /> 0 <br /> BOUNDARY LINE <br /> 4. Soils in the proposed permit area include o X 0 <br /> ERM <br /> Olney fine sand loam and Coscajo gravely W Z <br /> ERM <br /> DARY OUN Z <br /> SEE NOTE 81,\ tG MONA sandy loam. 2 <br /> ITE PERMIT AREA 5. Vegetation within the proposed permit area is U <br /> generally classified as being from a prairie Q <br /> 'W z ��� 200' I \ 2017-021 HATCHED shrubland ecoregion, but previous disturbances IL <br /> { ` have greatly changed the native vegetation <br /> 20'MINING Imo- I \ HARMONY WIND R character of the site. <br /> SETBACK ! j E `\,� SITE PERMIT AREA 6. The Lake Canal Ditch is near the south side LU <br /> . I PHASE II 9.9 ACRES SHADED of the proposed permit boundary, but the <br /> proposed mining operation does not anticipate 2 <br /> 25 MINING ' - <br /> !" SETBACK I �, any impacts to the ditch or surrounding J <br /> `.�� K groundwater hydrology. <br /> DIRT ACC 7. Best Management Practices will be used to <br /> limit discharge of stormwater and sediment <br /> 1 C ' 20'MINING ,�' 25'CITY OF GREELEY onto adjacent properties and waterways. <br /> ERIBURDEURDEi <br /> ' STOCKPILE �� SACK �� WATER LINE EASEMENT 8. The mining limits in Phase I and Phase II <br /> It A1 TYPICAL 50'MINING �' Rec. No. 3245837 follow the northern permit boundary to W <br /> =4 SETBACK Rec. <br /> facilitate reclamation consistency with Existing 1 0 <br /> Permit M-2017-021. U) Q <br /> AND ALDEN HILL ' �� �� BOIUNDARYUNET of <br /> I ', O <br /> J <br /> Z <br /> LEGEND: o z <br /> 50'MINING Q O <br /> SETBACK ��j OUNDARY C__�Proposed Permit Boundary Area Of 0 U <br /> 200' SEE NOTE 8 W C „ <br /> -------- Mining Setback Line IL W <br /> HISTORIC GROUND ` Permit Buffer Line W = <br /> 20'MININ Existing Permit M-2017-021 <br /> -= ------ --`��----- '\I SETBACK <br /> 20' min... <br /> 1'-3' SOIL/OVERBURDEN 0•5' `-� + 200' } --------Existing Easement Line <br /> 1, MINING SLOPE — Existing Gas Line <br /> w— Existing Water Line " <br /> 5'-7' SAND/GRAVEL STOCKPILE 7 <br /> PIT FLOOR TYPICAL =______= Existing Dirt Access o <br /> DESERAY . <br /> M>1 �1 F_ 0 .E <br /> TYPICAL MINING SECTION AND ALDEN HILL <br /> w0 ' ¢ <br /> = Z <br /> N.T.S. w <br />