My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-30_REVISION - M1980022 (6)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980022
>
2017-11-30_REVISION - M1980022 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:20:31 PM
Creation date
11/30/2017 4:31:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980022
IBM Index Class Name
REVISION
Doc Date
11/30/2017
Doc Name
Request For Acreage Reduction
From
Oldcastle SW Group
To
DRMS
Type & Sequence
AR1
Email Name
SJM
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Greg Lewicki And Associates, PLLC <br /> 3375 NV.Powers Circle Phone:(720)842-5321 Fax(303)346-6934 <br /> Littleton,CO 80123 E-mail: info@-4ewick-J.biz <br /> November 21, 2017 <br /> Colorado Division of Reclamation, Mining, and Safety <br /> 1313 Sherman St, Rm 215 <br /> Denver, CO 80203 <br /> Preston Pit(M-1980-022) Acreage Release and Bond Reduction <br /> To Whom It May Concern <br /> Oldcastle SW Group, Inc. dba United Companies is requesting the release of 47.6 acres of the <br /> Preston Pit,permit number M-1980-022. 8.9 acres of permit will remain in place to cover <br /> remaining material to be mined and processed, and the processing area of that operation. All <br /> remaining portions of the property have been reclaimed in accordance with the permit. A revised <br /> Mine Plan Map and Reclamation Plan Map are attached to this application. The revised bond <br /> calculation is below. <br /> 1. Bond Calculation <br /> The new bond at the Preston Pit will be dictated by the worst-case reclamation scenario for the <br /> remainder of the operation. That scenario is the current mining activity. Topsoiling and seeding <br /> of the disturbed areas is all that remains. Therefore, the bond calculation is based on those <br /> activities <br /> Table 1 —Bond Calculation <br /> Task# Description Cost <br /> i Topsoil all disturbed areas(6.0 acres)to a depth of 6 inches=4,840 CY @$1.50/CY 7260 <br /> 2 Disking and harrowing topsoil over 6.0 acres=6.0 acres @$150/acres 900 <br /> 3 Seed with approved seed mix over 6.0 acres=6.0 acres @$250/acre 1500 <br /> 4 Mulching over 6.0 acres=6.0 acres @$450/acre 2700 <br /> Subtotal $12,360 <br /> DRMS Costs at 28%of direct costs $3,461 <br /> Total $15,821 <br /> The remaining necessary bond for reclamation at the Preston Pit will be $15,821. <br /> Preston Pit 1 crm lxwkU and Utarbim PUC <br />
The URL can be used to link to this page
Your browser does not support the video tag.