control, costs invoicing, scheduling, subcontracting, and client relations. Mr. Louviere has served <br /> as Project Manager for GLEI for 6 years and successfully managed over 7,000,000 square foot of the slurry <br /> cutoff walls. <br /> • Steve Credeur,Construction Superintendent—Mr.Credeur will be responsible for day-to-day field <br /> operations and management of the project including implementation of the quality control and safety <br /> programs. Mr. Credeur has constructed over 10,000,000 square feet of slurry cutoff walls. <br /> SCOPE OF WORK <br /> The following provides a summary of GLEI's scope of work for this project: <br /> 1.0 Mobilization and demobilization of all the necessary labor, materials and equipment, as required to <br /> construct the proposed cutoff walls. <br /> 2.0 Construction of approximately 5,580 lineal feet of soil-bentonite slurry cutoff wall to an estimated <br /> average depth of 60 feet. It is currently estimated that the proposed cutoff wall will be 335,000-sf with <br /> depths no deeper than 74-feet. The total square footage will be adjusted as needed to meet the actual <br /> site conditions. Work includes a preconstruction mix design. <br /> The proposed cutoff walls will have a maximum seepage allowance of 0.03 CF/SF of wall per day. <br /> Work under this task does not include providing all daily QC testing, inspections and permeability <br /> testing as it is to be provided by Brierley Associates per the design report. A mounding cap consisting <br /> of surplus soils/spoils will be placed over the completed walls, as required. <br /> 3.0 Treatment of the on-site water source to meet the specified hardness of less than 100 ppm with a <br /> combination of soda ash and lime. Based on the initial testing treatment could be as much as 8 Ibs per <br /> 1,0000 gallons of water <br /> PRICING COST USED FOR <br /> The pricing for the work, as discussed under our scope of work, is as follows: SLURRY WALL <br /> Loloff Gravel Pit—Soil-Bentonite Slur Cutoff Wall Pricing <br /> Item Description Estimated Cost per Total Cost <br /> No. Quantity Unit <br /> 1. Mobilization/demobilization of necessary 1 $187, 00.00 $187,000.00 <br /> labor, materials, and equipment, as Lump Sum <br /> required <br /> 2. Soil-bentonite slurry cutoff wall 335,000- $4.25 $1,423,750.00 <br /> construction through overburden/alluvial Square Feet <br /> soils and 4.0 feet of key into underlying <br /> bedrock formation (including 1% dry <br /> bentonite addition <br /> 3. Treatment of Source Water to < 100 ppm 36,000 Ibs $.30 $10,800.00 <br /> with the combination of soda ash and lime <br /> Total Estimated Cost $1,621,550.00 <br /> "Final price will be based on actual installed quantity as measured from top of work platform to bottom of <br /> key <br /> GREAT LAKES <br /> ENVIRONMENTAL& <br /> INFRASTRUCTURE <br />