Laserfiche WebLink
Flag Resources, Inc. Silt Pit <br /> Permit# M-1981-202SG 2017 Annual Report <br /> Notes: <br /> Please refer to the 2017 Annual Report Map for location of the areas of disturbance in the mine. <br /> We continued to remove material from stockpiles and the mined area. No reclamation is required <br /> at this time. The markings and colors noted in the text refer to areas on the amp. <br /> Notes: <br /> (7) We continued to mine in the area east of the Plant Site as shown on the map. We continue to <br /> mine from the floor of the lake area. No new soils were placed on the topsoil piles and the total <br /> stockpiled topsoil remains at approximately 71,400 YD3 (brown) in the three stockpile areas. All <br /> sloping around the east lake is complete and graded 3:1. We completed the final 1500 feet this <br /> fall. Topsoil material has been piled along the part of the north shore so final soiling can be <br /> complete in. We are still using the Plant Site and it contains gravel stockpiles,and the office <br /> facilities. <br /> (9) The west lake area covers approximately 44.47 acres± (blue)and approximately 40.51 acres of <br /> the east part of the mine will fill with water when mining ends. We continue to fill and clean the <br /> settling ponds developed in 2006 (dark blue). Limited reclamation is needed in the current mining <br /> area since the slopes are shaped and only the above water slopes will need resoiling and <br /> revegetation. Sloping is complete on all slopes feet around the mined areas. Topsoil is stored along <br /> the perimeter of the mined area and the river for use in resoiling the slopes. The asphalt and <br /> concrete batch plants have been removed and cleanup is in progress in those areas. The asphalt <br /> plant area on the west side has been reclaimed (green). <br /> (10) No reclamation is required next year in the Plant Site area or in the mining area east of it. The <br /> western parcel may need additional seeding on the above water slopes. We will continue to monitor <br /> the west lake slopes and do remedial work in that area if necessary. <br /> (11) Mining will continue east of the Plant Site. We will continue to mine on the floor of the <br /> partially mined area. <br /> (14) Weed control was done in June 2017e mine and spot work was done on the Plant Site areas and <br /> roadways. Escort and 2-4-D was applied to the Hoary Crest,and Kochia,and Telar and Milestone <br /> was used on the Russian Knapweed. Ranger pro was use on grass areas to control the weeds in <br /> those areas. Weed control will continue in 2018 as needed. <br /> (18) The current bond is $468,320. The Division reviewed the bond in September 2017 and <br /> increased it by $412,920. This annual report shows that less area is disturbed or needs <br /> reclamation at this time than allowed in the bond estimate. Reclamation, except seeding of minor <br /> areas, is complete on the western 64.14 acres ±of the site. All sloping is done and much of the non <br /> active area has a topsoil cover. <br />