Laserfiche WebLink
RULE 3 PERFORMANCE BOND REQUIREMENTS <br /> RULE 3 PERFORMANCE BOND REQUIREMENTS <br /> The performance bond calculations for the East Pit and West Pit are included in Exhibit 13A in Volume <br /> 13. The Bond Calculation Maps showing the Worst Case Topography and Regraded Topography are <br /> included as Map 34A, 35A, and Map 36A, respectively. Bond Calculation Cross Sections are provided <br /> on Map 39,and facilities removal and regarde is presented on Map 38. <br /> Rule 3 Performance Bond Requirements 3-1 Revision Date: 8/28/17 <br /> Revision No.: TR-115 <br />