Laserfiche WebLink
2017 Rifle Reclamation Bond Estimate <br />Task 3: Revegetatlon <br />FERTILIZING <br />Materials <br />Des;ription Units/Acre U,it <br />Cost/Un.t <br />Cost/Acre <br />8-24.24, W15.15, 1&20-20 120 .b <br />$: 31 <br />$6.12 <br />Weed Spray, Hand, Non -Aquatic Area, noz. <br />Tota <br />Tota Mu <br />Application <br />Cost/Aae I $332.14 <br />Fertilizer <br />Materials <br />Cost/Acre <br />$612 <br />TILLING <br />Descrlpt!on <br />Cost/Acre <br />Cost/Acre <br />Disc Harrowing, 6' deep <br />Power Mulcher <br />$98.01 <br />Weed Spray, Hand, Non -Aquatic Area, noz. <br />Tota <br />Tota Mu <br />Application <br />Cost/Aae I $332.14 <br />Fertilizer <br />Application <br />Cost/Acre <br />$9g.01 <br />NI$1LGHING and MISCELLANEOUS <br />Materials <br />Application <br />Description <br />Cost/Acre <br />Crimping, with Tractor <br />$65.89 <br />Power Mulcher <br />$86,68 <br />Weed Spray, Hand, Non -Aquatic Area, noz. <br />$179-57 <br />Tota Mu <br />Application <br />Cost/Aae I $332.14 <br />Job Time and Cost <br />Site lNumberafAcres Estimated Failure Rate ISelected Replanting Work Items Cost/Acre 11nitial Job Cost IlleseedIng.lob Cost ITotal Job Cost <br />Weaver 1 165 50%Fertiliz:ng,Seeding Mulching 1$1.451.00 1 $2,394.151 $1,197.08 53,591.23 <br />