My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-27_REVISION - M1985038
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985038
>
2017-11-27_REVISION - M1985038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:41:15 PM
Creation date
11/27/2017 4:59:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985038
IBM Index Class Name
Revision
Doc Date
11/27/2017
Doc Name
Request for Surety Reduction
From
Pete Lien & Sons
To
DRMS
Type & Sequence
SR2
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2017 Me Reclamation Bond FMmate <br />Task 4: Moblllralton <br />EQUIPMENT TRANSPORT RIG COST <br />Shift Basis: 1 per day <br />Cost Data Source: CAG Data <br />Truck Tractor Description: Generic On -Highway truck Tractor, 6%4, Diesel Powered, 40014P <br />Truck Trailer Description; Generic Folding Gooseneck, Drop Deck Equipment Trailer <br />Cost breakdown: <br />Available RlgCapacities <br />0.25 Tons 2&SOTons <br />51+ Tons <br />Loading Time (Hours) <br />OwnershipCost/Hour: <br />$16.63 <br />$18.37 <br />$22.33 <br />OperatingCost/Hour: <br />$44.38 <br />$46.13 <br />$50.07 <br />OperatorCost/Hour: <br />527.66 <br />$27.66 <br />$27.66 <br />HelperCost/Hour.. <br />$O.DO <br />$25.39 <br />525.39 <br />Total UnitCost/Ho= <br />$88.67 <br />$117.55 <br />5125.45 <br />Weaver NON ROAPABIE EC;UIPMENT <br />EQUIPMENT HAUL DISTANCE ANTI TIME <br />Weaver <br />Nearest Major City or Town: We <br />Total One -Way Travel Distance: 20 miles <br />Average Travel Speed: 35 <br />Transssortatlen Cvde TimeWeaver <br />Haul Time (Noun) 057 <br />Return Time Woun) <br />0.57 <br />Loading Time (Hours) <br />1.5 <br />Unloading Time (Hours) <br />15 <br />Subtotals (Hours): <br />4.14 <br />lob Time (2 Rouen! Trips) <br />9.29 <br />Total Cost <br />$1,976.23 <br />•Assuming Two Round Trips for Hauling <br />
The URL can be used to link to this page
Your browser does not support the video tag.