Laserfiche WebLink
C. Project Description. Describe all aspects of the operation including mining, milling, and exploration methods, materials, <br /> equipment, workforce, construction and operation schedule, power requirements, how clearing will be accomplished, topsoil <br /> stockpile, waste rock placement, tailings disposal, proposed number of drillholes and depth, depth of proposed suction <br /> dredging, and how gravels will be replaced, etc. Calculate production rates of ore. Include justification and calculations for <br /> settling pond capacities,and the size of runoff diversion channels. <br /> D. Equipment and Vehicles. Describe that which is proposed for use in your operation(Examples:drill,dozer, wash plant,mill,etc.). Include: <br /> sizes,capacity,frequency of use,etc. <br /> E. Structures. Include information about fixed or portable structures or facilities planned for the operation. Show locations on the <br /> map. Include such things as living quarters,storage sheds,mill buildings, thickener tanks, fuel storage,powder magazines, <br /> pipelines, water diversions, trailers,sanitation facilities including sewage disposal, etc. Include engineering design and geotechnical <br /> information for project facilities,justification and calculations for sizing of tanks,pipelines and water diversions,etc. <br /> V. ENVIRONMENTAL PROTECTION MEASURES(SEE 36 CFR 228.8) <br /> A. Air Quality. Describe measures proposed to minimize impacts on air quality such as obtaining a burning permit for slash disposal <br /> or dust abatement on roads. <br /> (If more space is needed to fill out a block of information,use additional sheets and attach form) <br /> -3- <br />