My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-21_REPORT - M1978039HR
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1978039
>
2017-11-21_REPORT - M1978039HR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2017 3:13:40 PM
Creation date
11/22/2017 1:02:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978039HR
IBM Index Class Name
REPORT
Doc Date
11/21/2017
Doc Name
Annual Fee/Report/Map
From
Pinon Ridge Mining LLC
To
DRMS
Annual Report Year
2017
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br /> ' Total acres - ' Total acres 1 Total acres ' Total acres <br /> backfilled: seeded w/ w/topsoil mulched w/ <br /> D approved mix: I replaced: O approved mulct <br /> Total acres Total acres Topsoil Mulch application <br /> graded: 0 fertilized wi replacement / rate(tons): 0' <br /> apvd fertilizer depth(in.): /l� <br /> Seed Fertilizer Mulch <br /> application /1//# <br /> / ��J application A/ /J application �/�1 <br /> method: /►' �`J` method: /1� fJ method: / /ter <br /> 13. Is weed control being conducted in accordance with an approved Weed Control Plan? YES) NO N/A <br /> If"YES", indicate the weed species, control area, control type, application rate and treatment ate on the report map. <br /> 14. Is adequate topsoil reserved for reclamation, based on your approved permit? 'YES NO N/A <br /> If"NO",please explain: <br /> 15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? ES NO N/A <br /> If"NO"please explain: <br /> 16. If mining has exposed groundwater, is the site in compliance with the approved mining plan .•• Office of the State <br /> Engineer(Well Permit, S.W.S.P.,and/or Permanent Augmentation Plan)? OP NO N/A <br /> 17. Are all hazardous materials stored within approved spill containment structures? YES NO 41100 <br /> /YL Pkgete t //i?,WJ6.` e,e6 94 ,c/rE <br /> 18. Is your financial warranty value sufficient to cover the cost to complete reclamation? YES NO N/A <br /> 19. Is your basis for legal right to enter still valid? ES NO <br /> 20. Does your permit require you to submit monitoring information annually? YES dr N/A <br /> If"Yes",please attach the required monitoring results to this Annual Report. <br /> 21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br /> Construction Materials(C.R.S. 34-32-116 or 34-32.5-116),attach a map to this report that accurately depicts the permit <br /> boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br /> MAP ATTACHED: X <br />
The URL can be used to link to this page
Your browser does not support the video tag.