Laserfiche WebLink
b. Similarly, in the updated figures C-8 and D-3 the fuel storage area with secondary <br /> containment has been removed from the plan for the Base of Operations. Please <br /> clarify that was the applicant's intent, and that no fuel will be stored on site. If <br /> this was done in error, please submit a new figure C-8 and D-3 that includes the <br /> details of the fuel storage area with secondary containment as well as the details <br /> of secondary containment for the ore storage pad. <br /> Response: No fuel will be stored on site during the initial phases of <br /> operation. If fuel storage is necessary later, the requirement will be <br /> addressed through the Technical Revision Process. <br /> Please let me know if you have any other questions. <br /> Sincerely, <br /> 4 � v <br /> Sara atsis <br /> Manager of Sunrise Mining, LLC <br /> sglinatsis@diamondhillfarms.com <br /> 308-760-8925 <br /> 2 <br />