Laserfiche WebLink
Page 4 of 135 <br /> <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br /> <br />Task description: Haul Backfill Mat. from Coal Handling Fac. to Portal <br />Site: Peabody Sage Creek Mine Permit Action: RN1-2017 Permit/Job#: C2009087 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 10/17/2017 County: Routt Filename: C087-001 <br />User: TNL <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST Shift basis: 1 per day Equipment Description <br />Truck Loader Team -Truck: Cat 770D <br />-Loader: CAT 988H <br />Support Equipment -Load Area: Cat D10T - 10SU <br />-Dump Area: NA <br />Road Maintenance –Motor Grader: NA <br />-Water Truck: Water Tanker, 10,000 Gal. <br /> <br />Cost Breakdown: Truck/Loader Team Support Equipment Maintenance Equipment <br /> Truck Loader Load Area Dump Area Motor <br />Grader <br />Water Truck <br />%Utilization-machine: 100 95 100 NA NA 25 <br />Ownership cost/hour: $78.80 $83.38 $122.17 NA NA $60.47 <br />Operating cost/hour: $59.14 $77.17 $111.29 NA NA $22.04 <br />%Utilization-riper: NA 0 NA NA NA NA <br />Ripper own. cost/hour: NA $0.00 $0.00 NA NA $0.00 <br />Ripper op. cost/hour: NA $0.00 $0.00 NA NA $0.00 <br />Operator cost/hour: $31.17 $41.20 $41.85 NA NA $21.39 <br />Unit Subtotals: $169.11 $201.75 $275.31 NA NA $103.90 <br />Number of Units: 4 2 1 0 0 1 <br />Group Subtotals: Work: $1,079.94 Support: $275.31 Maint: $103.90 <br />Total work team cost/hour: $1,459.15 <br /> <br />MATERIAL QUANTITIES <br />Initial volume: 291,017 CCY Swell factor: 1.125 <br />Loose volume: 327,394 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00