Laserfiche WebLink
<br /> <br />COST SUMMARY WORK <br /> <br />Task description: RN1 Site Wide Cost Summary <br />Site: Peabody Sage Creek Mine Permit Action: RN1-2017 Permit/Job#: C2009087 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 11/14/2017 <br />10:15:11 AM <br />County: Routt Filename: C087-000 <br />User: JDM <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Haul Backfill Mat. from Coal Handling Fac. to <br />Portal <br />TRUCK1 2 243.07 $354,671.00 <br />002 Haul Backfill Material from Utility Pad Area to <br />Portal Face- <br />TRUCK1 3 102.12 $204,140.00 <br />003 Haul Backfill Material from South Facilities to <br />Portal Face- <br />TRUCK1 2 182.31 $316,207.00 <br />004 Remove Coal Stockpile Footprint TRUCK1 1 63.46 $103,316.00 <br />010 Regrade Cut Material Over 6.93 ROM Coal Area DOZER 1 46.54 $9,278.00 <br />011 Regrade Cut Material Over covered Storage Pad <br />Area <br />DOZER 1 6.94 $1,383.00 <br />012 Regrade Drill Pads COV11, CCU31, CCU47, <br />CCU58, CCU67, CCU84, <br />DOZER 1 7.78 $1,606.00 <br />013 Regrade Drill Pads CCU087 and Septic Drainfield DOZER 1 1.94 $402.00 <br />020 Remove Gravel from North Facilities Parking Area TRUCK1 1 4.99 $7,064.00 <br />021 Remove Gravel from Main North Facilities Area TRUCK1 1 11.51 $16,301.00 <br />022 Remove Gravel from North Facilities Electrical <br />Shop Area <br />TRUCK1 1 3.07 $4,346.00 <br />023 Remove Gravel from North Office Parking Area TRUCK1 1 0.58 $815.00 <br />024 Remove Gravel from South Powder Magazine Pad TRUCK1 1 0.49 $701.00 <br />030 Rip North Facilities Parking Area RIPPER 1 3.24 $966.00 <br />031 Rip North Facilities Area RIPPER 1 7.48 $2,230.00 <br />032 Rip North Electrical Shop Facilities Area RIPPER 1 1.99 $595.00 <br />033 Rip North Office Parking Area RIPPER 1 0.37 $111.00 <br />034 Rip South Powder Magazine Pad RIPPER 1 0.32 $98.00 <br />035 Rip South Covered Storage Area RIPPER 1 3.74 $1,115.00 <br />040 Rip Haulroad A/A1 Reduction RIPPER 1 8.85 $2,639.00 <br />041 Rip Haulroad B Reduction RIPPER 1 5.98 $1,784.00 <br />042 Rip Haulroad D RIPPER 1 2.61 $780.00 <br />045 Regrade Haulroad A/A1 Reduction DOZER 2 32.94 $19,627.00 <br />046 Regrade Haulroad B Reduction DOZER 2 22.27 $13,269.00 <br />047 Regrade Haulroad D DOZER 2 9.93 $5,915.00 <br />050 Regrade Upper Sump DOZER 1 10.36 $3,001.00 <br />051 Regrade Lower Sump DOZER 1 7.40 $2,143.00 <br />052 Regrade Area Ditches GRADER 1 1.03 $139.00 <br />053 Backfill and Regrade Microwave Tower Pad <br />(MR22) <br />DOZER 1 0.16 $21.00 <br />054 Replace Topsoil on Microwave Tower Pad DOZER 1 0.08 $10.00 <br />060 Replace Topsoil on Coal Handling Facilities Area SCRAPER1 1 30.32 $32,624.00