Laserfiche WebLink
Page 9 of 135 <br /> <br />CIRCES Cost Estimating Software <br />Truck Cycle Time: <br />Truck Exchange Time: 0.60 Minutes Adjusted for site altitude: 0.600 Minutes <br />Truck Load Time: 1.645 Minutes Adjusted for site altitude: 1.645 Minutes <br />Truck Maneuver and Dump <br />Time: <br />1.00 Minutes Adjusted for site altitude: 1.000 Minutes <br /> <br />Truck Travel (Haul & Return) Time: Road Condition: Firm, smooth, rolling, dirt/lt. surfaced, watered, <br />maintained 3.0 <br />Haul Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 500.00 0.00 3.00 3.00 2754 0.632 <br />Haul Time: 0.632 minutes <br />Return Route: <br />Seg # Haul Distance <br />(Ft) <br />Grade (%) Roll. Res <br />(%) <br />Total Res <br />(%) <br />Velocity <br />(fpm) <br />Travel <br />Time <br />(min) <br />1 500.00 0.00 3.00 3.00 4074 0.466 <br />Return Time: 0.466 minutes <br />Total Truck Cycle Time: 4.343 minutes <br />Loading Tool unit <br />Production <br /> <br />811.40 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />673.46 <br /> <br />LCY/Hour <br />Truck Unit Production <br />419.43 <br /> <br />LCY/Hour <br /> <br />Adjusted for job efficiency: <br /> <br />348.13 <br /> <br />LCY/Hour <br /> <br />Optimal No. of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br /> <br />Selected Number of Trucks: <br /> <br />2 <br /> <br />Truck(s) <br />Adjusted hourly truck team production: 696.26 LCY/Hour <br />Adjusted single truck/loader team production: 673.46 LCY/Hour <br />Adjusted multiple truck/loader team production: 2,020.39 LCY/Hour <br /> <br />JOB TIME AND COST <br />Fleet size: 3 Team(s) Total job time: 102.12 Hours <br /> <br />Unit cost: <br /> <br />$0.989 <br /> <br />/LCY <br /> <br />Total job cost: <br /> <br />$204,140