Laserfiche WebLink
C:OLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br /> Ne <br /> 1313 Sherman Street,Room 215,Denver,Colorado 80203 ph(303)866-3567RECEIVE <br /> REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET NOV .1 6 2017 <br /> ECLA��,aTIC <br /> R <br /> File No.: M- 1985-129 Site Name: Elbert County Pit DIVISION OF MrNINI; <br /> SAFETY <br /> County <br /> Permittee: Christian Construction Inc TROi <br /> ✓ Complie <br /> Operator(If Other than Permittee): Christian Construction Inc ions A <br /> PSH, WHE <br /> Permittee Representative: Robert Christian <br /> Please provide a brief description of the proposed revision: Submitting of weed control plan as there <br /> Is none to be found on record for permit M-1985-129_. <br /> As defined by the Minerals Rules, a Technical Revision(TR) is: "a change in the permit or application <br /> which does not have more than a minor effect upon the approved or proposed Reclamation or <br /> Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br /> meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br /> the Division may require the submittal of a permit amendment to make the required or desired changes <br /> to the permit. <br /> The request for a TR is not considered"filed for review"until the appropriate fee is received by the <br /> Division(as listed below by permit type). Please submit the appropriate fee with your request to <br /> expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br /> determine if it is approvable within 30 days. If the Division requires additional information to approve a <br /> TR,you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br /> day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br /> permittee requests additional time, in writing,to provide the required information. <br /> There is no pre-defined format for the submittal of a TR; however, it is up to the permittee to provide <br /> sufficient information to the Division to approve the TR request, including updated mining and <br /> reclamation plan maps that accurately depict the changes proposed in the requested TR. <br /> Required Fees for Technical Revision by Permit Type- Please mark the correct fee and submit it with <br /> your request for a Technical Revision. <br /> Permit T e Required TR Fee Submitted (mark only one) <br /> 110c, 111, 112 construction ❑ <br /> materials, and 112 quarries $216 '� <br /> 112 hard rock (not DMO) $175 ❑ <br /> I I Od, 112d(1, 2 or 3) $1006 11 <br />