My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-17_REPORT - M1977144
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977144
>
2017-11-17_REPORT - M1977144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2017 3:08:21 PM
Creation date
11/17/2017 3:02:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977144
IBM Index Class Name
Report
Doc Date
11/17/2017
Doc Name
Annual Fee/Report/Map
Annual Report Year
2017
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4of5 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />Total acres Total acres Total acres Total acres <br />backfilled: seeded w/ w/topsoil mulched w/ <br />approved mix: replaced: approved mulch: <br />Total acres Total acres Topsoil Mulch application <br />graded: fertilized w/ replacement rate (tonsfac): <br />a vd fertilizer: depth (in.); <br />Seed Fertilizer Mulch <br />application application I applicationImethod: method: method: <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? ( YES W N/A <br />If "YES", indicate the weed species, control area, control type, application rate and treatmeni4ate the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? NO N/A <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? NO N/A <br />If "NO" please explain: <br />I6. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the State <br />Engineer (Well Permit, S.W.S.P., and/or Permanent Augmentation Plan)? ES NO N/A <br />17. Are all hazardous materials stored within approved spill containment structures? NO N/A <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? ES NO N/A <br />19. Is your basis for legal right to enter still valid? YE NO <br />24. Does your permit require you to submit monitoring information annually? YESNIA <br />If "Yes", please attach the required monitoring results to this Annual Report. (! <br />0:) <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED:
The URL can be used to link to this page
Your browser does not support the video tag.