My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-13_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2017-11-13_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2017 2:01:41 PM
Creation date
11/15/2017 9:35:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
11/13/2017
Doc Name Note
SL11
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Findings
Email Name
ZTT
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The approved backfilling and grading plan for the Colowyo Mine is found in Volume 1 (East and <br />West Pit) and Volume 12 (South Taylor) of the PAP. Maps 19 and 19B show the approved post - <br />mining topography, Maps 29 and 29A show the backfilling and grading schedule, and Maps 41 <br />and 41A show the location of the permanent, post -mining drainage channels. The pre -mining <br />and post -mining cross-sections are shown on Maps 20 and 20B, and the permanent drainage <br />channel profiles are shown on Maps 33 and 33B. Exhibits 2 of the SL -11 application show <br />cross-sections of the SL -11 area, including approved post mining topography alongside the <br />constructed topography. <br />IV. OBSERVATIONS AND FINDINGS <br />The following discussion of observations and findings focuses on the results of backfilling and <br />grading work and drainage reestablishment in East and West Pit for the partial Phase I Bond <br />Release. <br />The evaluation of the bond release application included the bond release inspection, an office <br />review of the permit requirements and regulatory criteria, and review of past inspection reports. <br />The bond release inspection was conducted on July 25, 2017. Several items were reviewed by the <br />Division during the technical evaluation of the bond release application before, during, and after <br />the inspection, including: the post -mining topography and cross-sections of backfilled and graded <br />areas. <br />During the partial Phase I Bond Release inspection, participants walked through most of the <br />bond release request area to allow for visual assessment of compliance with pertinent <br />requirements. <br />Backfilling and Grading <br />For SL -11, observations were made during the bond release inspection with regard to <br />approximate original contour and stability of the reclaimed landscape. To determine compliance <br />with Colowyo's approved approximate original contour (AOC) in the SL -11 areas, elevation data <br />provided in the SL -11 Bond Release application was compared to GPS data collected by the <br />Division. Twenty two points were selected along three transect lines approximately every 300 <br />feet. Two transects with a total of 16 points were taken along the West Pit and one transect with <br />a total of 6 points was taken along the East Pit. Points were placed at selected contour elevations <br />in ArcGIS (to try to cover the majority of the area), and those points were then downloaded into <br />a Panasonic FZ-GI tablet. During the bond release inspection, Zach Trujillo navigated to the <br />points using the data in the Panasonic tablet and a GPS data point was collected at each site with <br />a Trimble R10 GNSS (R10) surveying unit. <br />The static precision of the R10 is 3.5 mm +0.4 ppm RMS and is on a localized geoid. For <br />comparison reasons, a known point was collected at the Colowyo Mine office to determine a <br />correction factor for the elevation collected with the R10. In Colowyo's coordinate system (UTM <br />NAD 27 Colorado State Plane) the elevation is 7,262.91' at the known base station and was <br />Proposed Decision and Findings of Compliance November 13 2017 <br />Partial Phase I Bond Release SL -11 Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.