Table 3. Summary of Applicable SL -11 Bond Release Amounts — West Pit <br />Task <br />Cost* <br />Doze Remaining West Pit Highwall <br />$ <br />218,244.00 <br />Doze Remaining West Pit Spoil <br />$ 3,298,550.00 <br />Load and Haul Spoil to West Pit <br />$ <br />465,007.00 <br />Rip Remaining West Pit Hi hwall <br />$ <br />110,024.00 <br />Finish Grade West Pit <br />$ <br />113,469.00 <br />Excavate Regraded Areas forPost-miningDrainage Channels <br />$ <br />45,578.00 <br />"Mine" Riprap from South Taylor Pit Stockpiles <br />$ <br />174,397.00 <br />Regrade East Taylor Pond <br />$ <br />5,171.00 <br />Regrade West Pit Pond <br />$ <br />14,417.00 <br />Remove and Regrade EastTaylorPond Ditch <br />$ <br />1,667.00 <br />Remove and Regrade West Pit Coal Road Ditch <br />$ <br />2,188.00 <br />Haul Topsoil fromPile 4AtoWestPit <br />$ <br />127,369.00 <br />Haul Topsoil fromPile 15B to WestPit <br />$ <br />409,026.00 <br />Haul Topsoil fromPile 15KtoWestPit <br />$ <br />75,996.00 <br />Haul Topsoil fromPile 16AtoWestPit <br />$ <br />96,167.00 <br />Haul TopsoilfromPile 16E to WestPit <br />$ <br />34,314.00 <br />Haul Topsoil fromWindrow 5 to West Pit <br />$ <br />33,387.00 <br />Replace Topsoil from Stockpile to East Ta lorPond <br />$ <br />1,614.00 <br />Replace Topsoil from Stockpile toWestPitPond <br />$ <br />2,943.00 <br />Reseed West Pit with Grazing Land Seed Mix <br />$ <br />616,216.00 <br />Reseed West Pit with Sagebrush Steppe SeedMix <br />$ <br />160,985.00 <br />Reseed East TaylorPondwith Grazing Land Seed Mix <br />$ <br />937.00 <br />Reseed West Pit Pond with Grazing Land Seed Mix <br />$ <br />1,709.00 <br />Weed Control -10% of Reseeded Areas Four Times <br />$ <br />40,911.00 <br />Mobilize/Demobilize Equipment <br />$ <br />236,792.00 <br />Site Maintenance During TenYearLiabifity Period <br />$ <br />76,039.00 <br />Subtotal of direct costs (rounded to nearest dollar) <br />$ 6,363,117.00 <br />Indirect Costs (rounded to nearest dollar) <br />$ 1,101,117.00 <br />Total Amount <br />$ 7,464,234.00 <br />Applicable Amount (-6%) <br />$ <br />470,247.00 <br />Total Bond Release Amount (60% ofApplicable Amount) <br />$ <br />282,148.00 <br />*Amounts adjusted based on amount released fromSL-09 and SLAG <br />Proposed Decision and Findings of Compliance November 13 2017 <br />Partial Phase I Bond Release SL -11 Page 9 <br />