Laserfiche WebLink
structures at the Base of Operations, May Day#1 and#2 are unclear. Please <br /> submit a narrative and separate engineered drawings detailing the specifications <br /> of the secondary containment structures for each of these facilities to be included <br /> in the Facilities Evaluation section of Exhibit U. <br /> Response: Please see Attachment 9 - Environmental Protection Plan. <br /> b. It is the Division's understanding that the previously submitted stand-alone <br /> document titled Updated Surface and Groundwater Characterization Data has <br /> been disseminated into each respective exhibit. In the Division's initial adequacy <br /> review, item 17 (f) asked for a summary interpretation of the surface and <br /> groundwater characterization data as required by section 6.4.21(9) (b) and (c). <br /> This information was requested to be included in Exhibits G and U. While the <br /> summary data tables were included in Exhibit G no interpretation of the data by <br /> the applicant was included in either location. Please submit a summary <br /> interpretation of the surface and groundwater characterization results that <br /> adequately addresses items in section 6.4.21(9) (b) and (c). <br /> Response: Please see Attachment 9 - Environmental Protection Plan. <br /> c. The construction schedule requested by item 17 k in the Division's initial <br /> adequacy review was not included. Please include discussions of all EPF's that <br /> have been identified that outlines a tentative construction schedule. This schedule <br /> can be approximate and not tied to a specific date. Provide an estimate on the <br /> length of time each facility will need to be constructed as well. <br /> Response: Please see Attachment 9 - Environmental Protection Plan. <br /> d. Please clarify that the proposed mining activities will not encounter the discussed <br /> flooded workings (Levels 423 and 545). Please clarify that proposed plans do not <br /> anticipate affecting the quantity of quality of water within those workings. <br /> Response: Please see Attachment 9 - Environmental Protection Plan. <br /> 7 <br />