My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-13_REVISION - M1981185
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2017-11-13_REVISION - M1981185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:31:09 PM
Creation date
11/15/2017 9:01:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
11/13/2017
Doc Name
Adequacy Review Response #2
From
Sunrise Mining
To
DRMS
Type & Sequence
AM2
Email Name
LJW
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
structures at the Base of Operations, May Day#1 and#2 are unclear. Please <br /> submit a narrative and separate engineered drawings detailing the specifications <br /> of the secondary containment structures for each of these facilities to be included <br /> in the Facilities Evaluation section of Exhibit U. <br /> Response: Please see Attachment 9 - Environmental Protection Plan. <br /> b. It is the Division's understanding that the previously submitted stand-alone <br /> document titled Updated Surface and Groundwater Characterization Data has <br /> been disseminated into each respective exhibit. In the Division's initial adequacy <br /> review, item 17 (f) asked for a summary interpretation of the surface and <br /> groundwater characterization data as required by section 6.4.21(9) (b) and (c). <br /> This information was requested to be included in Exhibits G and U. While the <br /> summary data tables were included in Exhibit G no interpretation of the data by <br /> the applicant was included in either location. Please submit a summary <br /> interpretation of the surface and groundwater characterization results that <br /> adequately addresses items in section 6.4.21(9) (b) and (c). <br /> Response: Please see Attachment 9 - Environmental Protection Plan. <br /> c. The construction schedule requested by item 17 k in the Division's initial <br /> adequacy review was not included. Please include discussions of all EPF's that <br /> have been identified that outlines a tentative construction schedule. This schedule <br /> can be approximate and not tied to a specific date. Provide an estimate on the <br /> length of time each facility will need to be constructed as well. <br /> Response: Please see Attachment 9 - Environmental Protection Plan. <br /> d. Please clarify that the proposed mining activities will not encounter the discussed <br /> flooded workings (Levels 423 and 545). Please clarify that proposed plans do not <br /> anticipate affecting the quantity of quality of water within those workings. <br /> Response: Please see Attachment 9 - Environmental Protection Plan. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.