Laserfiche WebLink
Attachment 8a - Structure Agreement Vaught <br /> `structure Agreement <br /> 'I his Agreement is entered into this 27`'day of September 2017, by and between Sunrise <br /> Mining. I.I.C. a Colorado Limited liability Company (":applicant") and <br /> 7 1- VC, <br /> is z§ t"5truct�rre 0\vner"). <br /> The Applicant is seeking a State ofcolorado ~-lined {.end Reclamation Board ("MI.RI3") <br /> permit to conduct mining operations at the NIP-N Day.ldaho Stine (,on7 lex, located in 1{csperus. <br /> La Plata County. Colorado. -_ w <br /> The Structure ()tNner owls a permanent man-made structure or:structures located within <br /> 2()() feet ofthe land affected by the proposed minniv and reclamation operations (,tile <br /> "Structure(s)"). <br /> :attached t'or retcrence in ideniii'vino the location of thv Struciure(s) iti a map ofthe <br /> proposed mining operations with tile: Structurc(s) marked. The attached neap is <br /> incorporated and made part of this .\orecrltent hv relcrencc. <br /> Pursuant to Rule 6.3).121 ot'the Mineral Rules and Regulations of the MLRB for Ilard <br /> Rock, Metal. and I7csionated :-lining (Operations. the 17ivision of Reclamation. Mining and <br /> Safety has requested the Applicant enter into this Agreement kith the Structure 0,mier whereby <br /> ,-applicant agrees to compensate the Structure Owier for any damagc that May Occur to the <br /> Structure(s) identified herein as a result ofthe :applicants rttininto operlrtions. <br /> [IN tills :\greemcrrt. the ..\pplicant commits and cm cnants that. if its mining operations <br /> cause damage to the Structure(s) omied by the Structure Applicant will repair or replace <br /> such Structurc(4) or contperrsate Structure (hNncr for the valuc ofthe said Structures) and will <br /> indentnifv StrUC[Ure Owner 16r any casts of repair to the: Stru01.11-e(5) incUrred by Structure <br /> 0)Nner•as a result of anti- damage cause by the applicant. <br />