Laserfiche WebLink
Receipt No.3650573E WELL PERMIT NUMBER 285910 - Page 2 <br /> J ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT <br /> 1 CONDITIONS OF APPROVAL <br /> jNOTE: Issuance of this permit does not guarantee that this well can be converted to a production well under a future <br /> permit. Additionally,pursuant to Rule 14.2 of the Water Well Construction Rules(2 CCR 402-2),monitoring holes <br /> constructed pursuant to a monitoring hole notice shall not be converted to a production well. (Upon obtaining a permit from <br /> the State Engineer,a monitoring hole may be converted to a monitoring well,recovery well for remediation of the aquifer,or <br /> a dewatering system for dewatenng the aquifer) <br /> NOTE:This permit will expire on the expiration date unless the well is constructed by that date.A Well Construction and <br /> Test Report(GWS-31)must be submitted to the Division of Water Resources to verify the well has been constructed.An <br /> extension of the expiration date may be available. Contact the DWR for additional information or refer to the extension <br /> request form(GWS-64)available at:http://www.water.state.co.us/pubs/forms.asp <br />