Laserfiche WebLink
Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No. M-88-112 <br />October 2017 Monthly Report <br />Page 3 <br />Table 2 — October 2017 Tailing Disposal Area Piezometer Depth to Water <br />Measurements (continued) <br />Piezometer <br />Date <br />Depth to Water <br />Met) <br />Total Depth (ft) <br />Volume of <br />Water ft <br />P10 <br />10/3I/17 <br />57.56 <br />58.30 <br />0.74 <br />PH <br />10/31/17 <br />41.39 <br />41.80 <br />0.41 <br />P12 <br />10/3I/17 <br />41.68 <br />41.71 <br />0.03 <br />P13 <br />10/31/17 <br />41.04 <br />41.34 <br />0.30 <br />P14 <br />10/3I/17 <br />41.21 <br />41.24 <br />0.03 <br />P15 <br />10/31/17 <br />40.85 <br />41.10 <br />0.25 <br />Table 3 below provides the calendar year 2017 sludge management for the San Luis site. <br />Table 3 - Water Treatment Plant Sludge Management Year to Date. <br />Date Quantity Sludge Management <br />July 2016 104 tons Sludge transferred from drying pad to tailings <br />impoundment. <br />Should you have any questions or comments, please do not hesitate to contact either myself at <br />(719) 379-0798 or Mr. Larry Fiske at (303) 837-5676. <br />incer <br />�io <br />el <br />J F. Madrid <br />S Supervisor Legacy Sites Reclamation and Closure <br />Cc: Larry Fiske <br />File <br />