My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-14_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2017-11-14_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2017 8:26:54 AM
Creation date
11/14/2017 3:30:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Hydrology
Doc Date
11/14/2017
Doc Name Note
October 2017
Doc Name
Monthly Report
From
Battle Mountain Resources, Inc.
To
DRMS
Report Quarter_Month
Oct
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c]N'� �NIN1Y1 <br />,� 30 N01<sll�la <br />- �oN <br />if ' BATTLE MOUNTAIN RESOURCES, INC. ,+�,�a� <br />November 9, 2017 <br />Mr. Lucas J. West <br />State of Colorado <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project <br />CMLRB Permit No.M-88-112 <br />October 2017 Monthly Report <br />Dear Mr. Lucas: <br />RECEIVED <br />NOY 14 2017 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br />San Luis Project for the month of October 2107. <br />Surface and ground water monitoring and analysis were completed for all required sites during the month <br />per the terms and conditions of the TR -32 Quality Assurance and Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on October 31', no water was present for sampling and <br />subsequent analysis. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br />Pit monitoring wells on October 31". The October tailing impoundment piezometer measurements <br />identified these installations were either dry or contained less than 12 inches of water as illustrated in <br />Table 2. Tables 1 and 2 below identify the depth to water measurements collected for each of the site <br />monitoring wells, piezometers and lysimeters as required by the terms and conditions of the TR -32 <br />QAIQC plan. <br />The leak detection system was measured on October 31 '. A total of 950 gallons of water was excavated <br />from the leak detection system yielding a monthly average of 27.9 gpad. The tailings pond under -drain <br />measured 38.0 gpm. <br />During the month of October, the West Pit water treatment plant operated efficiently discharging a total <br />of 8,075,800 gallons (24.79 acre-feet) of water to Rito Seco Creek and a total of 515,100 gallons (1.58 <br />acre-feet) of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito <br />Seco Creek remained dry during the month. <br />P.O. Box 310 • San Luis, Colorado 81152-0310 • (719) 379-0798 • Fax (719) 379-0713 <br />k( <br />
The URL can be used to link to this page
Your browser does not support the video tag.