Laserfiche WebLink
Responses to Second <br /> Adequacy Review Comments for <br /> Amendment 12 <br /> November 2017 <br /> Contents <br /> PROJECTDESCRIPTION...........................................................................................................................2 <br /> 6.4 SPECIFIC EXHIBIT REQUIREMENTS— 112d DESIGNATED MINING OPERATIONS.........2 <br /> 6.4.3 EXHIBIT C—Pre-mining&Mining Plan Map(s)of Affected Lands..............................................2 <br /> 6.4.4 EXHIBIT D—Mining Plan...............................................................................................................3 <br /> 6.4.6 EXHIBIT F—Reclamation Plan Map...............................................................................................3 <br /> 6.4.8 EXHIBIT H—Wildlife Information&6.4.12 EXHIBIT L—Reclamation Costs............................3 <br /> 6.4.15 EXHIBIT O—Owner(s)of Record of Affected Land(Surface Area)and Owners of Substance to <br /> beMined.......................................................................................................................................................3 <br /> 6.4.20 EXHIBIT T—Designated Mining Operation Environmental Protection Plan..................................4 <br /> Attachments <br /> Attachment 1 Updated Drawing C-1 <br /> Attachment 2 Drawing C-3 <br /> Updated Table T-1 <br /> Structure Agreements for Black Hills Energy, City of Victor, and Century Link <br /> Attachment 3 Screenshots from USPS Tracking—CCV Working on <br />