Laserfiche WebLink
r• <br />Transit Mix Concrete Co. <br />BRIERLEY <br />ASSOCIATES DAILY FIELD REPORT <br />Project <br />Daniel Sand Wash Fine Pit <br />Location <br />Colorndo Springs. CO <br />Client <br />Transit hits <br />Contractor <br />Pioneer Saud Civil Construction <br />Weather <br />Sunny <br />1. CONTRACTOR'S ACTt%IMS- <br />Pioneer crew equipment demobilizing from site. <br />Report No. <br />Wo <br />Date <br />&.2912017 <br />Page <br />I of 1 <br />File No. <br />516051-000 <br />Temperature <br />55-84'F <br />Using a long tale measurer. approxauate that mious are as follows. <br />• Crest of clubudattem 900 feet in length <br />• Near station 1+00, west side slope length 73 feet, crest width 18 feet, cast side slope length 84 feet <br />• Near station 3+00. west side slope length 72 feet, crest width 18 feet, cast side slope length 99 feet <br />• Near station 5+00. west side slope length 84 feet, crest width 19 feet, east side slope leueth 93 feet <br />• Near station 7+00_ west side slope Icugth ?9 feet, crest width 19 feet_ east side slope length 78 feet <br />• Near station 8+00_ west side slope length. 76 feet. crest width 22 feet <br />Fqutipuierrt onsite coiisisted of Deere s50K cratirler dozer. CAT 627K. <br />U. FIELD REPRESENTATIVE'S ACTIVITIES: <br />Surals h-lyers was onsite froui 0650 his to 0920 lus to suspect eurbanlaseut. <br />III. OTHER ONSITE AGENCY ACTIVTTIES <br />Hauling operations from the quarry throughout shift <br />Field Representative: Sarah Myers <br />Signature: � IJU <br />Page I of I <br />97 <br />