My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-09_REVISION - M1973007SG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973007
>
2017-11-09_REVISION - M1973007SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:41 PM
Creation date
11/13/2017 12:29:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
Revision
Doc Date
11/9/2017
Doc Name Note
As-built documents for new wash fines disposal pond
Doc Name
Quality Assurance Monitoring/Test Results
From
Transit Mix Concrete Co.
To
DRMS
Type & Sequence
TR5
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r. <br />Transit Mix Concrete Co. <br />BRIERLEY <br />ASSOCIATES <br />DAILY FIELD REPORT <br />Prnlect <br />Daniel Sand IVa y1L Fine Plc <br />Rrpoil Xo, <br />007 <br />Location <br />Colorado Springs, CO <br />Date <br />Ws? 3017 <br />Client <br />Transit Mix <br />Page <br />l of I <br />Contractor <br />Pioneer Send Civil Consrrucrion <br />Flle \'o. <br />51605I4000 <br />Weather <br />Sunny <br />Temperature <br />63-901F <br />L CONTRACTOR'S ACTIVITIES: <br />Pioneer crew consisted of 7 laborers. Pondiug %vater uoied ucar toc fiom staiiou 3+00 to 3+00 hi general <br />Ills ctnbatddttettt is Ievetlsttllllnr eles1apou front station 1+00 ro 7+00- <br />A[ 0730 los. Jill from Entech using nuclear densiry gauge at two locations along ciubaulancut. Lift passed <br />with den%ities of 113 to 114 pcf and moisture contents of 8 to 8.8 percent <br />Five scrapers continuously placed bft utatenal witlun embattlzr,ait footprint. In order to compact the lifts. <br />the scrapers drove over the placed soil with a fill bowl for the maximum amount of Wright Lift soil is <br />being tinusported front the onsite narthenn stack-pile/borrow ores assigned by Transit T1ix. It is taking the <br />scrapers approximately 5 umuics to transfer and place hft soil_ Stockpile consists of brown silty sand and <br />clayey sand with approumately 6 percent moisture content. <br />Dozer work-ing on eastern side slopes. Waicr tank-intck sprayed w rrcr au the lifts in order to increase the <br />moisture content of the silty sand. <br />Equipaient onsite consisted of: Deere It50K crawler dozer, CAT 95014. CAT 629 with paddle, CAT 627K_ <br />CAT 613C with 5000 galloo taupe CAT 623G. CAT wheel tractor scraper %ith open bowl. elm.ated water <br />inuL <br />II. FIELD REPRESENTATI E'S AC1t7 ! IES: <br />Sarah Myers WAS onsite from 0700lirs to 0900 firs to inspect cntbanlmient progress and lift placement <br />operations <br />UL OTHER O\SITE AGENCY ACTIVITIES <br />HeLLbug operations from the quarry throughout shift. <br />Field Representative: Sarah Myers <br />Sign -mile: &AV, A�' } <br />Page l of l <br />78 <br />
The URL can be used to link to this page
Your browser does not support the video tag.