Laserfiche WebLink
r- <br />� � Transit Mix Concrete Co. <br />BRIERLEY <br />ASSOCIATES <br />DAILY FIELD REPORT <br />Project <br />Daniel Sand Wash Fine pit <br />ReportNo. <br />005 <br />Location <br />Colorado Springs. CO <br />Date <br />5 22f2017 <br />Client <br />Transu Mm <br />Page <br />1 of 1 <br />Contractor <br />Piomcer Sand Ciel Construction <br />File No. <br />51605I4M <br />Weather <br />Itamy AM clmdy PM <br />Temperature <br />38-62°F <br />L CON'TRACTOR'S ACTr% IIIES- <br />Pioneer crew consisted of 5 laborers. Two o f the Iaborers were from Monks Constrtimon. <br />Upon arrival, f ntr scrapers were excavating within proposed pond footprint and placing lift from station <br />6+00 to 8+00 Pamkng mater was noted at station 4+- 0 and from station 1+00 to 2+50 Crushed concrete <br />has been placed from station 1-00 to 3+00 <br />At 0930 hrs dozer leveling from station 6+00 to 8 • J <br />At 1010 his. Jill from Entech using mscicar density gauge at two location: along �uthcrn lift Tests <br />indicated a density of 114.3 and moisture content 9 7 percent. <br />At 1025 his. scrapers adding another lift from station 6}00 to 8+00 <br />Egwptuent onsite consisted E Deere 85° X cowIer dozer CAT r _; CAT 528 with paddle CAT 6271c, <br />CAT 613C with 5000 gallon tank. CAT 623G. CAT wheel tractor server with open bowl, elevated water <br />tank. <br />M F1£L1] REPRESEN'TATI% E'S ACM'IIM: <br />Sarah Myers eras onsite from 0140 his to 1100 hrs to Inspect key excavation and Ith placement operations <br />TTI. OTHER ONSITE AGEt`CYACMMUS <br />Hauling operations firm the quarry throughout sluff. <br />Field Representative 5,irnb Myers <br />JA411"I. <br />Stgttatttre.._..— '_— <br />Page l of 1 <br />67 <br />