Laserfiche WebLink
rf <br />Transit Mix Concrete Co. <br />SRIERLEY <br />ASSOCIATES DAILY FIELD REPORT <br />Project <br />Daniel Sand Wash Fite Pit <br />Report No. <br />003 <br />Location <br />Colorado Spruip. CO <br />Date <br />5 15'2017 <br />Client <br />Transit Mix <br />Page <br />1 of 1 <br />Contractor <br />Pioneer Sand Civil CaustruC601L <br />File No. <br />516051-000 <br />'Weather <br />Cloudy ANL sunny PAI <br />Temperature <br />49-78,F <br />I. CONTRACTOR'S ACMTTiES: <br />Pioneer crc%v consisted of 5 laborers including foreman Robert James. Grant was in the process of ttauuug <br />two new drivers for the scrapers (laborers from Monks Construction). <br />At 0715 his, dozer began tsvrkitW on new routelltald road. <br />At 0720 his. three scrapers began excavating within pond footprim aid transporting sod to the nav <br />ratucillatd road. <br />From 08001us to 0900 lus. walled key excavation centerline from station I+00 to 8+00 to inspect <br />progress. Rater pouded % ithiu bottom of ley near station 4+00 and 4+50. Near station 2+00, the borront <br />of the key excavation was wet/maist. The northern and southern ley portions were sloped, depth of ley <br />met required tinction, subgrade consisted of native land. Key excavation from station 4+00 to 6+00 hill <br />not occur ruurl access road is rerouted this is anticipated to occur tomorrow monnug, <br />Equipment onsite consisted of: Deere 850K crawler dozer. CAT 950H. CAT 628 ♦Fish paddle_ CAT 627K. <br />CAT 613C with 5000 gallon taut:. CAT 6230. CAT wlicel tractor wcr-per v;lith open bowl. ela:rted sF;rter <br />tack <br />11, FIELD REPRESENTATIVE'S ACTIVITIES: <br />Smarr Myers was ousite from 0650 lus to 0900 his to iuspecl ley excava4ou operatious. <br />III_ OTHER ONSITE AGENCY ACTIVITIES <br />HaWing operadons ftom the quarry throughout shift. <br />Field Representative. Sarah Alyeis <br />Page l of 1 <br />56 <br />