Laserfiche WebLink
r <br />Transit Mix Concrete Co. <br />BRIERLU <br />003 <br />ASSOCIATES <br />DAILY FIELD REPORT <br />Project <br />Daniel Sand Rash Fine Pit <br />Location <br />Colorado Springs, CO <br />Client <br />Transit Mix <br />Contractor <br />Pioneer Sand Civil Construction <br />Weather <br />Cloudy, wind NNW 16 mph <br />Repoil \o. <br />003 <br />Date <br />5/11/2017 <br />Page <br />1 of I <br />File \o. <br />516051-000 <br />Temperature <br />43-63°F <br />I. CONTRACTOR'S ACTF%=S: <br />Pioneer crew consisted of 4 laborers includnig foreman Robert James Robert stated key excavation of the <br />southern portion would occur hucr this aftcmoon: kts stain focus is building the new route/hauI road_ <br />At 0715 hes. dozer began working on new route/haul road. <br />At 0730 Ins. two scrapers began excavating within pond footprint and transporting soil to the new <br />routefhaut mod. <br />From 0800 hrs to 09001rrs, walked key excavation centerline from station 1-00 to 8+00 with Grant <br />(Transit h fix) to inspect progress. Water ponded within bottom of key near station 4+00 and 4+50. Key <br />excavation from station 4+00 to 6+00 will not occur mud access road is rerouted. Key excaL.ation sides <br />were sloped from station 1+00 to 4+00. depth of key met required elevation. subgmde consisted of native <br />sand. Key excavation sides were sloped near station 6+00. <br />Equipment onsite consisted of- Deere 850K crawler dozer_ CAT 950H. CAT 628 with paddle_ CAT 627K. <br />CAT 613C with 5000 gallon tattle. CAT 623G. CAT wheel tractor scraper with open bowl, elevated water <br />tank. <br />IL FIELD REPRESENTATIVE'S ACTIVITIES: <br />Sarah Myers was onsite from 0650 his to 1000 brs to inspect ley excavation operations. <br />III. OTHER O\SUE AGENCY ACTIVITIES <br />Hauling operations from the quarry throughout shift. <br />Field Representative: Sarah Myers <br />Signature. 5 . <br />Page I of 1 <br />51 <br />