My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-09_REVISION - M1973007SG
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1973007
>
2017-11-09_REVISION - M1973007SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:23:41 PM
Creation date
11/13/2017 12:29:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
Revision
Doc Date
11/9/2017
Doc Name Note
As-built documents for new wash fines disposal pond
Doc Name
Quality Assurance Monitoring/Test Results
From
Transit Mix Concrete Co.
To
DRMS
Type & Sequence
TR5
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rr <br />Transit Mix Concrete Co. <br />11/03/2017 <br />Division of Reclamation, Mining and Safety <br />Attn: Mr. Tim Cazier <br />1313 Sherman St., Rm. 215 <br />Denver, CO 80203 <br />WON OF RICLAMATION <br />Re: As built documents for the new waste fines disposal pon, M1973- 00 7SG D ielsigH1Nl MB SAFETY <br />#2, TR #5 <br />mft� <br />Dear Mr. Cazier, <br />Attached for your review are the as built documents for the new wash fines disposal pond. <br />Transit Mix began discharging to the new wash fines disposal pond on October 5, 2017 and <br />ceased discharging wash fines to the old wash fines disposal pond on October 3, 2017. <br />The as built documents attached to this report include: <br />• a certified re -survey of the area, attached, <br />• the geotech. analyses, <br />• the daily QA/QC engineering reports, and <br />• Photos showing completed embankment plus discharge piping. <br />Please let us know if you have any questions concerning the enclosed documents. <br />If the above information is acceptable, this correspondence and the enclosed documents should <br />satisfy the requirements for the corresponding. Technical Revision #5. We want to thank you and <br />the rest of the DRMS for your help in getting this important facility approved and operational. <br />Respectfully; <br />Brandon Heser <br />TMCC Aggregate Production Manager <br />Encl: Geotechnical analyses <br />Daily QA/QC construction reports <br />Photos showing completed embankment plus discharge piping <br />Certified survey map showing new topography <br />
The URL can be used to link to this page
Your browser does not support the video tag.