Laserfiche WebLink
XcelEnergyv <br />August 31, 2017 <br />To whom it may concern: <br />In reference to the overhead electric power line in the vicinity of the property known as 7908 Highway 93, <br />Golden, Colorado; or has otherwise been described as the Pioneer Mining Reclamation/Leyden Pit Site: <br />We believe the overhead 15 Kv class power line through this property we was installed pre -1980's at the <br />invitation of the property owner at that time. <br />Since the installation of this pole line, the ground elevation in some areas has been lowered leaving some of the <br />poles on islands above the general grade of the surrounding area. It is our understanding landscaping work is <br />planned which is intended to redefine the slope on the perimeter of these islands. <br />Xcel does not have any issues and otherwise approves this landscaping work to redefine the slope on the <br />perimeter of these islands as long as earth is added to achieve these goals, no substantial amount of earth is <br />removed from these islands and proper clearances are maintained at all times. <br />Required minimum clearances: <br />Vertical clearance between overhead conductors and any surfaces - 18.5 feet <br />All equipment and persons must maintain a minimum 10 feet of separation between them and any extension of <br />themselves (a hammer or 2x4 they may be holding) from any conductor at all times. (Touching these lines will <br />kill) <br />Sincerely <br />Mark Staggs <br />Area Engineer, North Denver Region <br />303-425-3852 mprLsIp srftc7pienergy.com <br />