Laserfiche WebLink
EXHIBIT G — WATER INFORMATION <br />There are currently 1.5 acres of exposed groundwater that are Post -1981 in origin. This will be <br />eliminated through the process of backfilling with existing soil stockpiles found within the site. There will <br />be no need for permitted augmentation due to the Army Corps' determination of non jurisdictional <br />groundwater and the proposed backfilling. Refer to Exhibit E — Reclamation plan for more information <br />regarding the pond backfilling. <br />It is important to note that Exhibit E discusses re -grading the site and that this will conform to the <br />natural drainage pattern in this area and will not change historical runoff. <br />