My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-11-07_REPORT - M1981088
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981088
>
2017-11-07_REPORT - M1981088
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2017 10:29:15 AM
Creation date
11/8/2017 8:30:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981088
IBM Index Class Name
Report
Doc Date
11/7/2017
Doc Name
Annual Fee/Report/Map
From
Bratton Enterprises, Inc.
To
DRMS
Annual Report Year
2017
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 5 <br />1'2. -Total acres in various stages or reclamation, since permitted mining activitiesbegan: <br />I Total acres ) i Total acres Total acus j Total arm <br />backrl ser3ed av/ i-WA-01wo mrrlr� A4 <br />I �� re t awroved maw <br />Total acres <br />� / � <br />Total acres <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />TopsoilMuicb <br />appficafim <br />graded: <br />1a <br />fer0med wl O <br />If "NO" please explain: ., <br />replacement <br />D rate (tonslacj Q <br />-2 <br />vd fertilizer: <br />NO CED <br />depth (in.): <br />YES NO NIA <br />Seed <br />Fertilizer <br />YES NO NIA <br />Mulch <br />YE NO <br />application <br />YES NIA <br />(5 <br />application <br />application <br />0 <br />method: <br />method: <br />method: <br />13. Is weed control being conducted in accordance with an approved Weed Control Plan? <br />QYENO NIA <br />If "YES", indicate the weed species, control area, control type, application rate and treatment date on the report map. <br />14. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />YES NO IA <br />If "NO", please explain: <br />15. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />YES NO NIA <br />If "NO" please explain: ., <br />NN <br />16. If mining has exposed groundwater, is the site in compliance with the approved' mining plan - --6Office of th tate ; <br />Engineer ( Well Permit, S. W.S.P., and/or Permanent Augmentation Plan)? <br />NO CED <br />17. Are all hazardous materials stored within approved spill containment structures? <br />YES NO NIA <br />18. Is your financial warranty value sufficient to cover the cost to complete reclamation? <br />YES NO NIA <br />19. Is your basis for legal right to enter still valid? <br />YE NO <br />20. Does your permit require you to submit monitoring information annually? <br />YES NIA <br />(5 <br />If "Yes", please attach the required monitoring results to this Annual Report. <br />21. As required by Colorado Mined Land Reclamation Act and/or Colorado Land Reclamation Act for the Extraction of <br />Construction Materials (C.R.S. 34-32-116 or 34-32.5-116), attach a map to this report that accurately depicts the permit <br />boundary, current affected area boundary and location of the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: V/ <br />*�o <br />01 OL <br />a J*4k� <br />
The URL can be used to link to this page
Your browser does not support the video tag.